SIMAR PROJECTS came into existence with a dream to be a pioneer in world-class construction and engineering development. Based on the professional deliverance and commitment levels of its employees and with the focused management vision, the group today has successfully executed projects for the renowned public as well as private sector companies in international along with nationwide clients.
Projects
OUR PROJECTS
SANJOG SUGARS/ IJT
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Erection, Testing & Commissioning of 1×47 TPH Travelling Grate Boiler, Ducting, APH, ESP, IBR Piping in Rajasthan. | SANJOG SUGARS/ IJT | 06 Months | Completed |
TRIVENI/IJT
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Erection, Testing & Commissioning of 1×120 TPH Travelling Grate Boiler, IBR Piping, Fans, Ducting, APH at Khatauli in Uttar Pradesh | TRIVENI/IJT | 11 Months | Completed |
PBPL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Erection, Testing & Commissioning of 12 MW Travelling Grate Boiler with IBR Piping, Cooling Water Piping, Raw Water Piping, DM Water Piping, ESP, Fans, APH, Ducting etc. | PBPL | 16 Months | Completed |
JAYPEE
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Erection, Testing & Commissioning of 1×170 TPH CFBC Boiler, IBR Piping, Fans, Ducting, APH etc. at Rewa. | JAYPEE | 18 Months | Completed |
THERMAX
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Erection & Commissioning of Mechanical Works For Boiler, ESP, IBR/NIBR Piping and BOP &UNLOADING, STACKING VERIFICATION, STORE MANAGEMENT For 1X20 MW MWV India Packaging Board PVT Ltd Vapi, Gujarat | MWV India Packaging Board PVT Ltd Vapi, Gujarat | 12 Months | Completed |
2. |
Mechanical Erection Work of Boiler, ESP, Piping & auxiliaries including Housekeeping and Material Handling for 1×4.1 MW CPP of NV International Pvt. Ltd. | NV International/Thermax | 12 Month | Completed |
3. |
Erection, Testing and Commissioning and Allied Works (Including Housekeeping and Material Management) along with Power Cycle and Utility for 10 MW Waste Heat Recovery CPP at JK Cement, Chitourgarh, Rajasthan | JK Cement/ Thermax | 12 Months | Completed |
LNT-MHI/FL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Fabrication of the secondary structures, Duct, Elevators and Miscellaneous Platforms for 2 x 700 MW Boilers. | LNT-MHI/FL | 12 Months | Completed |
SKIPPER NIGERIA LIMITED
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Assembly Erection, Testing & Commissioning of H&M Equipment’s for Kano Hydro Electric Project for Skipper Nigeria Limited, at Tiga Site, Nigeria | Skipper Nigeria Limited | 08 Months | Continue… |
PSEB
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit -4 | PSEB/PCP | 01 Months | Completed |
2. | Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit 5 | PSEB/PCP | 01 Months | Completed |
3. | Erection, Testing and Commissioning of the complete package of ESP, Milling System, Fans and Ducting of 2 x 250 MW Power Plant at GHTP, Lehra Mohabat, PSEB, Bathinda Punjab | PSEB | 24 Months | Completed |
4. | Annual turbine, Generator overhauling of Unit -II & IV at Guru Gobind Singh Thermal Power Station, Rupnagar, Punjab. | GGSSTTP | 01 Months | Completed |
PSEB/ALSTOM
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2 | PSEB/ALSTOM | 01 Months | Completed |
2. | Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2 | PSEB/ALSTOM | 01 Months | Completed |
3. | Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 3 | PSEB/ALSTOM | 01 Months | Completed |
NPL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Commissioning Support for Mechanical Maintenance Work of Power Plant Equipment’s, Piping, Valves etc. at 2×700 MW NPL Rajpura, Punjab | NPL | 06 Months | Completed |
2. | Operation & Maintenance Services of Ash Handling Plant (AHP), Mill Reject System (MRS) and Recovery system WRS at 2X700 MW Nabha Power Limited. | L&T Nabha Power. | 12+24 Month | Continue… |
JSW/BELLARY
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of SBU 2, 2×300 MW . | JSW/Bellary | 09 Days | Completed |
2. | Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of CPP3, 2×300 MW. | JSW/Bellary | 45 Days | Completed |
3. | Annual Overhauling of Turbine, Boiler and its Auxiliaries, APH & Fans with auxiliaries at CPP 2 at JSW Energy, Bellary. | JSW/Bellary | 01 Months | Completed |
KFCL, KANPUR
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Services for erection & commissioning of the Drum Belt at KFCL, JAIPRAKASH ASSOCIATES LIMITED. | KFCL,Kanpur | 02 Months | Completed |
ACBIL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Annual Overhauling of Turbine & Auxiliaries of Unit 1 & 2 at 2x 135 MW, ACBIL, Kasaipali, Chhattisgarh. | ACBIL | 01 Months | Completed |
2. | Annual Contract for Operation & Maintenance of Boiler & its auxiliaries, Turbine auxiliaries, CHP, AHP, WTP and BOP at 2x50MW Spectrum Coal & power limited, Chhattisgarh. | ACB-Spectrum Coal & Power | 12+12 Months | Completed |
MCCPL,CG
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Inspection and correction of Turbine bearing no. 01 to 09, alignment of MOP & Bearing gear at 1x 300 MW MCCPL, Bandhakhar, and Chhattisgarh. | MCCPL, CG | 01 Months | Completed |
2. | Maintenance works for Electrical and Control & Instrumentation of 1×300 MW Thermal Power Plant. | Maruti Clean & Coal power Ltd | 12 Months | Completed |
TSPL, PUNJAB
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 1 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. | TSPL, Punjab | 01 Months | Completed |
2. | Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. | TSPL, Punjab | 01 Months | Completed |
3. | Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. | TSPL, Punjab | 02 Months | Completed |
TATA POWER-CGPL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Annual Overhauling of Boiler & its auxiliaries of Unit #40 & Unit # 50 at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra | TATA POWER -CGPL | 06 Months | Continue… |
2. | Annual Overhauling of Boiler & its auxiliaries of Unit #40 at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra | TATA POWER -CGPL | 02 Months | Completed |
HPGCL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2×300 MW at Unit – 1&2. | DCRTPP/HPGCL | 15 Months | Completed |
2. | Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2×300 MW at Unit – 1&2. | DCRTPP/HPGCL | 15 Months | Completed |
3. | Complete Maintenance of Coal Mills, RC Feeders of 2 x 600 MW Boiler at Unit–1&2 at RGTPP/HISAR | HPGCL/ HISAR | 15 Months | Completed |
4. | Assistance in Operations, Commissioning & Stabilization of 2 x 600 MW Boiler, Turbine, BOP, Electrical and C&I at RGTP, Hisar | HPGCL/ HISAR | 12 Months | Completed |
5. | Erection & Alignment of Structure of lift for Unit – 1 including Sheeting of 2×600 MW at RGTPP, Hisar | HPGCL/ HISAR | 05 Months | Completed |
6. | Erection of the Balance Structure and Piping (IBR& NIBR) work for Unit – 1 & 2 of 2 x 600 MW at RGTPP, Hisar | HPGCL/ HISAR | 08 Months | Completed |
7. | Modification of the Structure including the addition of Landing Platform at a different level for Unit – 1 & 2 of 2 x 600 MW at RGTPP, Hisar | HPGCL/ HISAR | 06 Months | Completed |
8. | Replacement of Support/Guide Bearing of APH of 2 x 600 MW at Hisar. | HPGCL/HISAR | 01 Months | Completed |
9. | Fabrication of structures, ducting, Boiler Elevators at 2×600 MW at Reliance 2×600 MW Hisar, Haryana. | HPGCL/HISAR | 12 Months | Completed |
10. | Complete Erection, Testing, Trail Assembly, Commissioning of Sky Climber of 2 x 600 MW Power Plant at RGTPP, Hisar Haryana | HPGCL/HISAR | 02 Months | Completed |
11. | Complete Work of Dust Suppression System of 4 x 110MW and 2 x 250 MW work including Civil Works, Erection & Commissioning of Pumps which also includes laying Underground Piping with Wrapping and Coating & Commissioning of complete DSS. | HPGCL/HISAR | 12 Months | Completed |
12. | Fabrication, Painting, Erection, Welding, Alignment of Turbine with auxiliaries and Pipe Rack Structure of Fuel handling system of 2 x 250 MW at Panipat. | HPGCL/PANIPAT | 08 Months | Completed |
13. | Complete Package of Fuel Handling system with Piping IBR /NON-IBR including Processed Piping with Pumps and Oil Tanks of HFO /LDO Tanks with Steam Heaters of 2 x 250 MW at Panipat. | HPGCL/PANIPAT | 09 Months | Completed |
14. | Annual Overhauling of Pressure Parts of Boiler unit #1 and Unit #2 at 2×600 MW CLP Jhajjar- Haryana | CLP/JHAJJAR | 02 Months | Completed |
15. | Annual Overhauling of APH & Fans of unit #1 at 2×600 MW CLP Jhajjar- Haryana | CLP/JHAJJAR | 01 Months | Completed |
16. | Assistance in Operations, Commissioning & Stabilization of 2 x 300 MW Boiler, Turbine, BOP, Electrical, C&I at DCRTPS Y’Nagar | DCRTPS/REL | 12 Months | Completed |
PTPS/HPGCL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Maintenance of all Equipment’s of Conveyor System (Routine & Breakdown) & Heavy Equipment’s of Coal Handling Plant – II of 2 x 210 MW PTPS-HPGCL, Panipat Haryana | PTPS/HPGCL | 07 Months | Completed |
2. | Complete Mechanical Maintenance of Types of equipment of Conveyor System of Coal Handling Plant-I of 4 x 110 MW Boilers. | PTPS/HPGCL | 24 Month | Completed |
3. | Complete Mechanical Maintenance of Crusher, RDM, Wagon Tippler, Motors, and other Allied Equipment’s installed at CHP-II of 2 x210 MW PTPS-HPGCL, Panipat Haryana. | PTPS/HPGCL | 15 Month | Completed |
4. | Complete Maintenance of Tube Coal Mills, RC Feeders & Vibrators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 6 | PTPS/HPGCL | 15 Month | Completed |
5. | Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit – 1 & 2. | PTPS/HPGCL | 15 Month | Completed |
6. | Complete Maintenance of Coal Mills, RC Feeders & Variations & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 | PTPS/HPGCL | 15 Month | Completed |
7. | Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit 1 & 2. | PTPS/HPGCL | 15 Month | Completed |
8. | Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment’s of Unit – 7&8 | PTPS/HPGCL | 15 Months | Completed |
9. | Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Unit 2×250 MW – 7&8 | PTPS/HPGCL | 15 Month | Completed |
10. | Routine/Breakdown/ Capital Maintenance of all Electrical &Electronics (C&I) Equipment of Unit –7&8 of 2×250 MW | PTPS/HPGCL | 15 Month | Completed |
11. | Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of CHP-II of 2×210 MW Boilers | PTPS/HPGCL | 07 Month | Completed |
12. | Maintenance / Replacement of Fabric / Conveyor Belt Compensators over existing Metallic Expansion Joints of Boiler of 110 MW at Unit -2 | PTPS/HPGCL | 04 Month | Completed |
13. | Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 5 of 210 MW capacity at PTPS, Panipat | PTPS/HPGCL | 01 Month | Completed |
14. | Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 4 of 110 MW capacity at PTPS, Panipat | PTPS/HPGCL | 01 Months | Completed |
15. | Capital Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6 | PTPS/HPGCL | 01 Month | Completed |
16. | Overhauling of complete Pressure Parts, Pent House, APH of 110 MW Boiler at Unit-2 | PTPS/HPGCL | 01 Month | Completed |
17. | Overhauling of Pressure Parts, Cleaning, Washing & Repairing of the Pent House of 110 MW Boiler at Unit – 3 | PTPS/HPGCL | 01 Month | Completed |
18. | Overhauling of RAH, ESP, Gates & Dampers, various Ducts of 210 MW Boiler at Unit-5 | PTPS/HPGCL | 01 Month | Completed |
19. | Repair/Rectification of 6 Nos. Damaged ESP Fields / ESP Structure along with Replacement of the Slide Bearing of 210 MW Boiler at Unit-6 | PTPS/HPGCL | 01 Month | Completed |
20. | Overhauling of Instrument Air Compressor of 110 MW Boiler at Unit-2 | PTPS/HPGCL | 01 Month | Completed |
21. | Operation and Maintenance of complete Coal Handling Plant – II of 2×210 MW, PTPS-HPGCL, Panipat Haryana | PTPS / TECPRO | 07 Month | Completed |
22. | Operation & Maintenance of Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal handling Plant – III of 2×250 MW, PTPS-HPGCL, Panipat Haryana. | PTPS / TECPRO | 07 Month | Completed |
23. | Renovation & Modernization of Conveyor Belts by replacing existing Toughing Idlers frame with Rollers, Flat Return Idlers, Toughing Training Idlers, Return Training Idlers & Impact Idlers of 20 Toughing Angle with 35 Toughing Angle Idlers & replacement of Vibrating Feeders, Flap Gates, Transfer Chutes of Coal Handling Plant – I of 4 x 110 MW, PTPS-HPGCL, Panipat Haryana. | PTPS/RMEC | 06 Months | Completed |
24. | Routine, Breakdown & Capital Maintenance of all Electrical & Electronics (C&I) Types of equipment in CHP-II of 2 x 210 MW Boilers. | PTPS/RMEC | 15 Months | Completed |
25. | Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal Handling Plant – III of 2×250 MW | PTPS/RMEC | 15 Months | Completed |
26. | Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6 | PTPS/RMEC | 01 Months | Completed |
27. | Complete Maintenance of Coal Mills, RC Feeders & Variations & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 | PTPS | 15 Months | Completed |
28. | Capital overhauling of unit-3 of 110Mw at PTPS Panipat complete pressure parts. | PTPS | 1.5 Month | Completed |
KEC INTERNATIONAL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Operation & Maintenance of 1 X 18 MW solar Power Plant orf KEC International at Jalaun, Uttar Pradesh. | KEC International | 36 Months | Completed |
UPCL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd. | UPCL | 24 Months | Completed |
NPCIL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Service Contract for Supervisory assistance, Computerisation Work, Dispensary assistance & office assistance task in day-to-day function at GHAVP site and its associated infrastructures/Office and Other Location for 18 Months | NPCIL/GHAVP | 18 Month | Completed |
2. | Operation and Maintenance of construction power supply system at GHAVP site & at its proposed infrastructure facilities for 2 years.” | Nuclear Power Corporation of India Limited | 24 Month | Continue… |
JSPL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Annual Mechanical Maintenance & Operations of Boiler Turbine Generator & BOP of 4×135 MW power plants at DCPP of JSPL at Dongamuha, Raigarh. | JSPL | 12 Months | Continue… |
2. | Misc. work During Overhauling including Vortex Plate & APH tube replacement in 4 x135 MW JSPL, Korba, CG. | JSPL | 01 Month | Completed |
3. | Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL, Raighar. | JSPL | 02 Month | Completed |
4. | Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For 135 MW Power Plant at Angul, Orissa. | JSPL | 1.5 Month | Completed |
5. | Annual Overhauling of Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. | JSPL | 01 Month | Completed |
6. | Annual Overhauling and Annual Maintenance of Boiler, Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. | JSPL | 01 Month | Completed |
7. | Resolving Operation problems including proposing modifications of 4 x 135 MW, CFBC Boilers at DCPP, JSPL, Raigarh | JSPL | 01 Month | Completed |
JANG-E-AZADI
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Selection of Contractor for Providing Facility Management Service for Jang-e-Azadi Memorial Project at Kartarpur | Jang-e-Azadi | 12+12 Month | Continue… |
GVK
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Complete Operation & Maintenance Services for BTG, BOP, SwitchYard, Electrical and C&I and Auxiliaries including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at Goindwal Sahib, Punjab. | GVK | 36 Month | Continue… |
2. | Field operations of Boiler, Coal Mills, Fans, DM Plant, FOPH, CW/ RW / FF / SW / PW/ ETP/ STP, Turbine & its Auxiliaries, ESP, Ash Handling Plant, SwitchYard, Switch Gears including HT / LT System etc. of 2 x 270 MW Power Plant at Goindwal Sahib, Punjab. | GVK | 36 Month | Completed |
TRN ENERGY LIMITED
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Maintenance Contract of BTG & Mill Reject System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po- Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.) | TRN Energy Limited | 36 Months | Continue… |
2. | Maintenance Work For Electrical and C & I at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.) | TRN Energy Limited | 36 Month | Continue… |
3. | Annual Service Contract for Maintenance of Main Plant and Plant Water System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.) | TRN Energy Limited | 12 Month | Completed |
4. | Operation & Maintenance of Ash Handling Plant at 2 X 300 MW TRN Energy Pvt.Ltd, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.) | TRN Energy Limited | 12 Month | Completed |
STEAG/TSPL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Annual Mechanical Maintenance Contract for Boiler & its Auxiliaries, TG & its Auxiliaries, Balance of Plant, Operation Assistance in Water Treatment Plant including material handling and Housekeeping of 3x660MW Super Critical Power Plant of M/S Talwandi Sabo Power Limited,Vill. Banwala, Dist. Mansa, Punjab for Five Years. | STEAG/TSPL | 60 Months | Continue… |
2. | Operation and maintenance of Boiler, Ash Handling & its Auxiliaries of 3×660 MW Super Critical Thermal Power Plant at Talwandi Sabo, Mansa Punjab. | TSPL/Vedanta Group | 36 Month | Completed |
3. | Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at HMEL, Bathinda (Punjab). | STEAG/HMEL | 24 Month | Completed |
JSW
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Operation & Maintenance of Ash Handling Plant CPP Unit 3 & 4 (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. | JSW | 36 Months | Continue… |
2. | Annual Maintenance, Preventive Maintenance & Breakdown Maintenance of Boiler, Turbine and its Auxiliaries CPP- I,II,III,IV & SBU- I,II at 1690 MW JSW Energy Limited, Bellary Karnataka. | JSW | 36 Month | Continue… |
3. | AMC for Mechanical Preventive Maintenance & Misc. Services of Boiler and Auxiliaries of SBU 2 and CPP3&4 units Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. | JSW | 24+12 Month | Completed |
4. | AMC for Mechanical Breakdown Maintenance & Misc. Services of Boiler, CHP and Auxiliaries of SUB2 and CPP3&4 Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. | JSW | 24+12 Month | Completed |
5. | Annual Overhauling of ESP, APH of SBU #2, CPP3 at 4X300 MW JSW Energy, Bellary | JSW | 02 Month | Completed |
6. | Annual Overhauling of Boiler and Turbine with auxiliaries at 4X300 MW JSW Energy, Bellary | JSW | 02 Month | Completed |
7. | Annual Overhauling of LT Motors at 4X300 MW JSW Energy, Bellary | JSW | 02 Month | Completed |
RELIANCE ROSA
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Annual Maintenance Contract of Boiler, Mill & its Auxiliaries of 4×300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh. | Reliance Rosa | 36 Month | Continue… |
2. | Annual Overhauling of Boiler Pressure Part, APH, Fans, ESP & Coal burner of Unit 1 & 3 of 4×300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh. | Reliance Rosa | 01 Month | Completed |
SEL IPP/ EESI
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Complete Maintenance (Routine, Breakdown, Preventive) of Boilers along with its auxiliaries of 4 x 600MWBoilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda | SEL IPP/ EESI | 52 Months | Completed |
2. | Field Operations of BOP of 4 x 600 MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda | SEL IPP/ EESI | 42 Month | Completed |
3. | Capital Overhauling of Pressure Parts, Burners, Pent & Dog House, Fans – (ID/FD/PA/SA), Valves, Ducting, Pumps, Compressors, Gates and Dampers etc. of 2 x 600 MW Power Plants at Jharsuguda. | SEL IPP/ EESI | 01 Months | Completed |
4. | Maintenance for the housekeeping and material management of 4 x 600 MW boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda | SEL IPP/ EESI | 36 Month | Completed |
5. | Capital Overhauling of ESP & Bag Filters of 2 x 600 MW Power Plants at Jharsuguda. | SEL IPP/ EESI | 01 Month | Completed |
6. | Capital Overhauling of Coal Mills, Gates & Dampers of 2 x 600 MW Power Plants at Jharsuguda. | SEL IPP/ EESI | 01 Month | Completed |
7. | Capital Overhauling of Air Pre Heaters of 2 x 600 MW Power Plants at Jharsuguda. | SEL IPP/ EESI | 01 Month | Completed |
8. | Design, Detailing, Supply of Material, Fabrication, Erection and Assembly of Access & Platforms at 4×600 MW IPP of Sterlite Energy limited at Jharsuguda, Orissa. | SEL IPP/ EESI | 12 Months | Completed |
DB POWER
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Commissioning Support for Complete Power Plant for Mechanical, Electrical and C&I for BTG, BOP Equipment, Associated Piping, CHP & AHP of 2×600 MW DBPL BADAHARA, Chhattisgarh | DB POWER | 24 Month | Completed |
LANCO POWER CORPORATION
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Routine, Preventive, Predictive Maintenance of Boiler, Turbine and Auxiliaries, All Pumps, DM water plant, Fans of Cooling Towers, Fans, Compressors, HFO system, Ash Handling & BOP etc. of 2×600 MW at LANCO Anpara Power Corporation Ltd, Uttar Pradesh. | LANCO Anpara Power Corporation Ltd | 36+36 Month | Continue… |
2. | AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd. | LANCO-Amarkantak | 36 Month | Completed |
ADANI POWER RAJASTHAN LTD.
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Providing Complete mechanical maintenance Service including preventive maintenance, regular maintenance & break down maintenance of Boiler & its Auxiliaries (including ESP), Turbine Auxiliaries and BOP and Boiler tubes weld joints repair for Unit-I & II, Kawai Thermal Power Plant, Rajasthan | Adani Power Rajasthan Ltd. | 24 Month | Continue… |
NTPC LIMITED
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Boiler, Turbine, Air Compressors and AC of Stage-I (3 X 800 MW) Units at NTPC Kudgi, Karnataka | NTPC Limited, Kudgi | 36 Month | Continue… |
2. | Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Balance of Plant (BOP) of Stage-I (2 X 800 MW) Units at NTPC Gadarwara | NTPC Limited Gadarwara |
36 Month | Continue… |
ESSAR POWER M.P LIMITED
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Annual Mechanical Maintenance of BTG, BOP and AHP for Unit # 1 & Unit # 2 | Essar Power M.P Limited | 36 Month | Continue… |
2. | Annual overhauling of Boiler Pressure Part, APH, FAN, Coal Burner, Safety valve 2X600 MW Essar Power M.P Limited, Bandhora, Waidhan, M.P | Essar Power M.P Limited | 1 Month | Completed |
ISGEC
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Fabrication of Pressure Vessels and Evaporators. | Y’NAGAR/ ISGEC | 1..5 Years | Completed |
2. |
Fabrication, Assembly, Welding, Pre/Post Weld Treatment and Hydro Testing of Headers. | Y’NAGAR/ ISGEC | 36 Month | Completed |
3. |
Fabrication of Pressure Parts of High-Pressure Boiler Components i.e. Water Wall Tubes, Economiser, LTSH, Loose Tubes, Panels, Roof Tubes. | RATANGARH/ ISGEC | 2.5 Years | Completed |
ICS SENEGAL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Turn around Maintenance of SAP & PAP at 01 MT capacity at ICS-Senegal (International). Includes Piping, Equipment’s(rotary +Static) | ICS Senegal | 06 Month | Completed |
OMPL/TOYO/ THERMAX
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Fabrication, Erection, Testing and commission of piping (Executed Qty: – 74000 INM which includes P-91, P-11, 22, SS- 304L, 316L, 310 L,CS) of combined cycle of 72 MW including commissioning of HRSG, GTG and STG at OMPL (Petrochemical Complex) at Mangalore, Karnataka.. | OMPL/TOYO/ THERMAX | 12 Month | Completed |
2. | Assembly and Erection of steel stack along with Platforms of 74 Mtrs height of 72MW at OMPL, Mangalore, Karnataka (QTY -02 No. stacks). | OMPL/TOYO/ THERMAX | 03 Month | Completed |
OCFL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Fabrication, Erection, Testing and Commissioning of Piping along with Rotating Equipment’s includes CS, AS, SS, P91, 904L, LTCS, Rubber Line, Jacketed piping, Cast Iron (5,10,000 Inch Meter) of 2 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL Paradeep Orissa. | OCFL | 24 Month | Completed |
2. | Assembly, Erection, Testing and Commissioning of Static and Rotating Equipment (Total Weight 19000 MT) of 02 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL, Paradeep, Orissa. | OCFL | 22 Month | Completed |
IOCL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Operation & Maintenance of 5 MW solar Photovoltaic Power Plant at IOCL, Rawra Rajasthan | IOCL | 36 Months | Continue… |
2. | Mechanical Maintenance of rotary parts on round the clock basis for PNC at IOCL (Refineries Division) Panipat Naphtha Cracker, Panipat, Haryana. | IOCL | 12 Month | Continue… |
3. | Erection, testing & commissioning of complete sulphur furnace package with burners, Boiler drum, furnaces, IBR & NIBR piping at IOCL, Panipat Refinery. | IOCL | 06 Month | Completed |
ISRL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | ARC for Supply of Manpower for Rotary Equipment maintenance & Workshop Mechanical Maintenance at ISRL Complex, Panipat, Haryana | ISRL,Panipat | 36+24 Month | Continue… |
2. | Service contract for ‘Rotary & Static Equipment Maintenance’ at ISRL Complex, Rubber plant, Panipat, Haryana. | ISRL,Panipat | 36 Month | Continue… |
TATA-TPDDDL
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Operation & Maintenance services of 1X108 MW Gas based Power Plant at TATA POWER-Rithala Plant, Delhi. | TATA-TPDDDL | 36 Month | Continue… |
HINDUSTAN ZINC LIMITED
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1 | Operation & Maintenance of Ore Beneficiation Plant of Zinc of 4.7 mm MT of Hindustan Zinc limited Zawar Mines, Udaipur Rajasthan. | Hindustan Zinc Limited | 36 Month | Continue… |
DANGOTE REFINERY
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Composite Electrical works in upcoming Oil Refinery including Erection, Testing & commissioning of Transformers, LT/ HT Bus bars, HT/LT Motors, Laying HT/LT Cables & installation of C&I system at Dangote Refinery Nigeria. | Dangote Refinery | 18 Months | Continue… |
RELIANCE JAMNAGAR REFINERY
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Piping & Structural Steel works of Mechanical Contract for Additive Dosing tank In DTA RTF.(30000 IND) | Reliance Jamnagar | 06 Months | Completed |
2. | Stack Height Increase, CFN Piping and Flue Gas Duct jobs at SEZ-FCCU Reliance Industries Limited Jamnagar Gujarat. | Reliance Jamnagar | 2.5 Month | Completed |
3. | IBR Related Piping Modification/ Inspection Jobs at SEZ-FCCU Area Reliance Industries Limited Jamnagar Gujarat. | Reliance Jamnagar | 1.5 Months | Completed |
4. | Structural Steel Fabrication/ Mechanical and other related Works at SFS- SEZ, RIL- Jamnagar J3 Project | Reliance Jamnagar | 30 Month | Completed |
5. | Structural Erection works-MEG area | Reliance Jamnagar | 08 Month | Completed |
6. | Mechanical structural erection at SEZ PCG area | Reliance Jamnagar | 01 Year | Completed |
7. | Circular Platform Erection works SEZ-MEG area | Reliance Jamnagar | 02 Month | Completed |
RELIANCE SIBUR ELASTOMERS PRIVATE LIMITED
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Mechanical Field Works at IIR Butyl Rubber Plant-, Structural Steel Fabrication & Erection, Equipment Erection (Static & Rotary), ABG Piping, Bolt Torqueing etc… | Reliance Sibur Elastomers Private Limited | 12 Month | Continue… |
2. | UnderGround Piping Works | Reliance Sibur Elastomers Private Limited | 08 Month | Continue… |
RELIANCE/ LINDE ENGINEERING INDIA LTD
Sr. No | Description of Works | Plant / Client Name | Duration | Status |
1. | Structural, Piping and Equipment(Static & Rotary) Installation Works 5000 MT at Reliance Industries, Jamnagar, SEZ 1 and SEZ 2 Steam Supper Heater Project. | Reliance/ Linde Engineering India Ltd | 09 Month | Completed |