OUR PROJECTS

SIMAR PROJECTS came into existence with a dream to be a pioneer in world-class construction and engineering development. Based on the professional deliverance and commitment levels of its employees and with the focused management vision, the group today has successfully executed projects for the renowned public as well as private sector companies in international along with nationwide clients.

SANJOG SUGARS/ IJT

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection, Testing & Commissioning of 1×47 TPH Travelling Grate Boiler, Ducting, APH, ESP, IBR Piping in Rajasthan. SANJOG SUGARS/ IJT 06 Months Completed

TRIVENI/IJT

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection, Testing & Commissioning of 1×120 TPH Travelling Grate Boiler, IBR Piping, Fans, Ducting, APH at Khatauli in Uttar Pradesh TRIVENI/IJT 11 Months Completed

PBPL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection, Testing & Commissioning of 12 MW Travelling Grate Boiler with IBR Piping, Cooling Water Piping, Raw Water Piping, DM Water Piping, ESP, Fans, APH, Ducting etc. PBPL 16 Months Completed

JAYPEE

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection, Testing & Commissioning of 1×170 TPH CFBC Boiler, IBR Piping, Fans, Ducting, APH etc. at Rewa. JAYPEE 18 Months Completed

THERMAX

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection & Commissioning of Mechanical Works For Boiler, ESP, IBR/NIBR Piping and BOP &UNLOADING, STACKING VERIFICATION, STORE MANAGEMENT For 1X20 MW MWV India Packaging Board PVT Ltd Vapi, Gujarat MWV India Packaging Board PVT Ltd Vapi, Gujarat 12 Months Completed
 
2.
Mechanical Erection Work of Boiler, ESP, Piping & auxiliaries including Housekeeping and Material Handling for 1×4.1 MW CPP of NV International Pvt. Ltd. NV International/Thermax 12 Month Completed 
 
3.
Erection, Testing and Commissioning and Allied Works (Including Housekeeping and Material Management) along with Power Cycle and Utility for 10 MW Waste Heat Recovery CPP at JK Cement, Chitourgarh, Rajasthan JK Cement/ Thermax 12 Months Completed

LNT-MHI/FL

Sr. No Description of Works Plant / Client Name Duration Status
1. Fabrication of the secondary structures, Duct, Elevators and Miscellaneous Platforms for 2 x 700 MW Boilers. LNT-MHI/FL 12 Months Completed

SKIPPER NIGERIA LIMITED

Sr.  No Description of Works Plant / Client Name Duration Status
1. Assembly Erection, Testing & Commissioning of H&M Equipment’s for Kano Hydro Electric Project for Skipper Nigeria Limited, at Tiga Site, Nigeria Skipper Nigeria Limited 08 Months Continue…  

PSEB

Sr.  No Description of Works Plant / Client Name Duration Status
1. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit -4 PSEB/PCP 01 Months Completed   
2. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit 5 PSEB/PCP 01 Months Completed   
3. Erection, Testing and Commissioning of the complete package of ESP, Milling System, Fans and Ducting of 2 x 250 MW Power Plant at GHTP, Lehra Mohabat, PSEB, Bathinda Punjab PSEB 24 Months Completed
4. Annual turbine, Generator overhauling of Unit -II & IV at Guru Gobind Singh Thermal Power Station, Rupnagar, Punjab. GGSSTTP 01 Months Completed   

PSEB/ALSTOM

Sr.  No Description of Works Plant / Client Name Duration Status
1. Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2 PSEB/ALSTOM 01 Months Completed   
2. Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2 PSEB/ALSTOM 01 Months Completed   
3. Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 3 PSEB/ALSTOM 01 Months Completed   

NPL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Commissioning Support for Mechanical Maintenance Work of Power Plant Equipment’s, Piping, Valves etc. at 2×700 MW NPL Rajpura, Punjab NPL 06 Months Completed   
2. Operation & Maintenance Services of Ash Handling Plant (AHP), Mill Reject System (MRS) and Recovery system WRS at 2X700 MW Nabha Power Limited. L&T Nabha Power. 12+24 Month Continue…

JSW/BELLARY

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of SBU 2, 2×300 MW . JSW/Bellary 09 Days Completed   
2. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of CPP3, 2×300 MW. JSW/Bellary 45 Days Completed   
3. Annual Overhauling of Turbine, Boiler and its Auxiliaries, APH & Fans with auxiliaries at CPP 2 at JSW Energy, Bellary. JSW/Bellary 01 Months Completed   

KFCL, KANPUR

Sr.  No Description of Works Plant / Client Name Duration Status
1. Services for erection & commissioning of the Drum Belt at KFCL, JAIPRAKASH ASSOCIATES LIMITED. KFCL,Kanpur 02 Months Completed  

ACBIL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhauling of Turbine & Auxiliaries of Unit 1 & 2 at 2x 135 MW, ACBIL, Kasaipali, Chhattisgarh. ACBIL 01 Months Completed   
2. Annual Contract for Operation & Maintenance of Boiler & its auxiliaries, Turbine auxiliaries, CHP, AHP, WTP and BOP at        2x50MW Spectrum Coal & power limited, Chhattisgarh. ACB-Spectrum Coal & Power 12+12 Months Completed   

MCCPL,CG

Sr.  No Description of Works Plant / Client Name Duration Status
1. Inspection and correction of Turbine bearing no. 01 to 09, alignment of MOP & Bearing gear at 1x 300 MW MCCPL, Bandhakhar, and Chhattisgarh. MCCPL, CG 01 Months Completed   
2. Maintenance works for Electrical and Control & Instrumentation of 1×300 MW Thermal Power Plant. Maruti Clean & Coal power Ltd 12 Months Completed   

TSPL, PUNJAB

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 1 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. TSPL, Punjab 01 Months Completed   
2. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. TSPL, Punjab 01 Months Completed   
3. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. TSPL, Punjab 02 Months Completed   

TATA POWER-CGPL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhauling of Boiler & its auxiliaries of Unit #40 & Unit # 50  at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra TATA POWER -CGPL 06 Months Continue…   
2. Annual Overhauling of Boiler & its auxiliaries of Unit #40  at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra TATA POWER -CGPL 02 Months Completed   

 

HPGCL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2×300 MW at Unit – 1&2. DCRTPP/HPGCL 15 Months Completed   
2. Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2×300 MW at Unit – 1&2. DCRTPP/HPGCL 15 Months Completed   
3. Complete Maintenance of Coal Mills, RC Feeders of 2 x 600 MW Boiler at Unit–1&2 at RGTPP/HISAR HPGCL/ HISAR 15 Months Completed   
4. Assistance in Operations, Commissioning & Stabilization of 2 x 600 MW Boiler, Turbine, BOP, Electrical and C&I at RGTP, Hisar HPGCL/ HISAR 12 Months Completed   
5. Erection & Alignment of Structure of lift for Unit – 1 including Sheeting of 2×600 MW at RGTPP, Hisar HPGCL/ HISAR 05 Months Completed   
6. Erection of the Balance Structure and Piping (IBR& NIBR) work for Unit – 1 & 2 of 2 x 600 MW at RGTPP, Hisar HPGCL/ HISAR 08 Months Completed   
7. Modification of the Structure including the addition of Landing Platform at a different level for Unit – 1 & 2 of 2 x 600 MW at RGTPP, Hisar HPGCL/ HISAR 06 Months Completed   
8. Replacement of Support/Guide Bearing of APH of 2 x 600 MW at Hisar. HPGCL/HISAR 01 Months Completed   
9. Fabrication of structures, ducting, Boiler Elevators at 2×600 MW at Reliance 2×600 MW Hisar, Haryana. HPGCL/HISAR 12 Months Completed   
10. Complete Erection, Testing, Trail Assembly, Commissioning of Sky Climber of 2 x 600 MW Power Plant at RGTPP, Hisar Haryana HPGCL/HISAR 02 Months Completed   
11. Complete Work of Dust Suppression System of 4 x 110MW and 2 x 250 MW work including Civil Works, Erection & Commissioning of Pumps which also includes laying Underground Piping with Wrapping and Coating & Commissioning of complete DSS. HPGCL/HISAR 12 Months Completed   
12. Fabrication, Painting, Erection, Welding, Alignment of Turbine with auxiliaries and Pipe Rack Structure of  Fuel handling system of 2 x 250 MW at Panipat. HPGCL/PANIPAT 08 Months Completed   
13. Complete Package of Fuel Handling system with Piping IBR /NON-IBR including Processed Piping with Pumps and Oil Tanks of HFO /LDO Tanks with Steam Heaters of 2 x 250 MW at Panipat. HPGCL/PANIPAT 09 Months Completed   
14. Annual Overhauling of Pressure Parts of Boiler unit #1 and Unit #2 at 2×600 MW CLP Jhajjar- Haryana CLP/JHAJJAR 02 Months Completed   
15. Annual Overhauling of APH & Fans of unit #1 at 2×600 MW CLP Jhajjar- Haryana CLP/JHAJJAR 01 Months Completed   
16. Assistance in Operations, Commissioning & Stabilization of 2 x 300 MW Boiler, Turbine, BOP, Electrical, C&I at DCRTPS Y’Nagar DCRTPS/REL 12 Months Completed

PTPS/HPGCL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Maintenance of all Equipment’s of Conveyor System (Routine & Breakdown) & Heavy Equipment’s of Coal Handling Plant – II of 2 x 210 MW PTPS-HPGCL, Panipat Haryana PTPS/HPGCL 07 Months Completed
2. Complete Mechanical Maintenance of Types of equipment of Conveyor System of Coal Handling Plant-I of 4 x 110 MW Boilers. PTPS/HPGCL 24 Month Completed
3. Complete Mechanical Maintenance of Crusher, RDM, Wagon Tippler, Motors, and other Allied Equipment’s installed at CHP-II of 2 x210 MW PTPS-HPGCL, Panipat Haryana. PTPS/HPGCL 15 Month Completed
4. Complete Maintenance of Tube Coal Mills, RC Feeders & Vibrators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 6 PTPS/HPGCL 15 Month Completed
 5. Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit – 1 & 2. PTPS/HPGCL 15 Month Completed
6. Complete Maintenance of Coal Mills, RC Feeders & Variations & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 PTPS/HPGCL 15 Month Completed
7. Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit 1 & 2. PTPS/HPGCL 15 Month Completed
8. Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment’s of Unit – 7&8 PTPS/HPGCL 15 Months Completed
9. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Unit  2×250 MW – 7&8 PTPS/HPGCL 15 Month Completed
10. Routine/Breakdown/ Capital Maintenance of all Electrical &Electronics (C&I) Equipment  of Unit –7&8 of 2×250 MW PTPS/HPGCL 15 Month Completed
11. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of CHP-II of 2×210 MW Boilers PTPS/HPGCL 07 Month Completed
12. Maintenance / Replacement of Fabric / Conveyor Belt Compensators over existing Metallic Expansion Joints of Boiler of 110 MW at Unit -2 PTPS/HPGCL 04 Month Completed
13. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 5 of 210 MW capacity at PTPS, Panipat PTPS/HPGCL 01 Month Completed
14. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 4 of 110 MW capacity at PTPS, Panipat PTPS/HPGCL 01 Months Completed
15. Capital Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6 PTPS/HPGCL 01 Month Completed
16. Overhauling of complete Pressure Parts, Pent House, APH of 110 MW Boiler at Unit-2 PTPS/HPGCL 01 Month Completed
17. Overhauling of Pressure Parts, Cleaning, Washing & Repairing of the Pent House of 110 MW Boiler at Unit – 3 PTPS/HPGCL 01 Month Completed
 18. Overhauling of RAH, ESP, Gates & Dampers, various Ducts of 210 MW Boiler at Unit-5 PTPS/HPGCL 01 Month Completed
19. Repair/Rectification of 6 Nos. Damaged ESP Fields / ESP Structure along with Replacement of the Slide Bearing of 210 MW Boiler at Unit-6 PTPS/HPGCL 01 Month Completed
20. Overhauling of Instrument Air Compressor of 110 MW Boiler at Unit-2 PTPS/HPGCL 01 Month Completed
21. Operation and Maintenance of complete Coal Handling Plant – II of 2×210 MW, PTPS-HPGCL, Panipat Haryana PTPS / TECPRO 07 Month Completed
 22. Operation & Maintenance of Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal handling Plant – III of 2×250 MW, PTPS-HPGCL, Panipat Haryana. PTPS / TECPRO 07 Month Completed
23. Renovation & Modernization of Conveyor Belts by replacing existing Toughing Idlers frame with Rollers, Flat Return Idlers, Toughing Training Idlers, Return Training Idlers & Impact Idlers of 20 Toughing Angle with 35 Toughing Angle Idlers & replacement of Vibrating Feeders, Flap Gates, Transfer Chutes of Coal Handling Plant – I of 4 x 110 MW, PTPS-HPGCL, Panipat Haryana. PTPS/RMEC 06 Months Completed   
24. Routine, Breakdown & Capital Maintenance of all Electrical & Electronics (C&I) Types of equipment in CHP-II of 2 x 210 MW Boilers. PTPS/RMEC 15 Months Completed   
25. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal Handling Plant – III of 2×250 MW PTPS/RMEC 15 Months Completed   
26. Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6 PTPS/RMEC 01 Months Completed   
27. Complete Maintenance of Coal Mills, RC Feeders & Variations & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 PTPS 15 Months Completed   
28. Capital overhauling of unit-3 of 110Mw at PTPS Panipat complete pressure parts. PTPS 1.5 Month Completed   

 

KEC INTERNATIONAL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Operation & Maintenance of 1 X 18 MW solar Power Plant orf KEC International at Jalaun, Uttar Pradesh. KEC International 36 Months Completed   

UPCL

Sr.  No Description of Works Plant / Client Name Duration Status
1 AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd. UPCL 24 Months Completed   

NPCIL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Service Contract for Supervisory assistance, Computerisation Work, Dispensary assistance & office assistance task in day-to-day function at GHAVP site and its associated infrastructures/Office and Other Location for 18 Months NPCIL/GHAVP 18 Month Completed  
2. Operation and Maintenance of construction power supply system at GHAVP site & at its proposed infrastructure facilities for 2 years.” Nuclear Power Corporation of India Limited 24 Month Continue…

JSPL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Annual Mechanical Maintenance & Operations of Boiler Turbine Generator & BOP of 4×135 MW power plants at DCPP of JSPL at Dongamuha, Raigarh. JSPL 12 Months Continue…
2. Misc. work During Overhauling including Vortex Plate & APH tube replacement in 4 x135 MW JSPL, Korba, CG. JSPL 01 Month Completed
3. Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL, Raighar. JSPL 02 Month Completed
4. Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc.  For 135 MW Power Plant at Angul, Orissa. JSPL 1.5 Month Completed
 5. Annual Overhauling of Boiler   Pressure Parts, IBR HP Valve, BED Nozzles etc.  For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. JSPL 01 Month Completed
6. Annual Overhauling and Annual Maintenance of Boiler, Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc.  For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. JSPL 01 Month Completed
7. Resolving Operation problems including proposing modifications of 4 x 135 MW, CFBC Boilers at DCPP, JSPL, Raigarh JSPL 01 Month Completed

 

JANG-E-AZADI

Sr.  No Description of Works Plant / Client Name Duration Status
1 Selection of Contractor for Providing Facility Management Service for Jang-e-Azadi Memorial Project at Kartarpur Jang-e-Azadi 12+12 Month Continue…

GVK

Sr.  No Description of Works Plant / Client Name Duration Status
1 Complete Operation & Maintenance Services for BTG, BOP, SwitchYard, Electrical and C&I and Auxiliaries including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at Goindwal Sahib, Punjab. GVK 36 Month Continue…
 2. Field operations of Boiler, Coal Mills, Fans, DM Plant, FOPH, CW/ RW / FF / SW / PW/ ETP/ STP, Turbine & its Auxiliaries, ESP, Ash Handling Plant, SwitchYard, Switch Gears including HT / LT System etc.  of 2 x 270 MW Power Plant at Goindwal Sahib, Punjab. GVK 36 Month Completed

 

TRN ENERGY LIMITED

Sr.  No Description of Works Plant / Client Name Duration Status
1 Maintenance Contract of BTG & Mill Reject System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po- Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.) TRN Energy  Limited 36 Months Continue…
2. Maintenance Work For Electrical and C & I at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.) TRN Energy  Limited 36 Month Continue…
3. Annual Service Contract for Maintenance of Main Plant and Plant Water System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.) TRN Energy  Limited 12 Month Completed
4. Operation & Maintenance of Ash Handling Plant at 2 X 300 MW TRN Energy Pvt.Ltd, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.) TRN Energy  Limited 12 Month Completed

STEAG/TSPL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Annual Mechanical Maintenance Contract for Boiler & its Auxiliaries, TG & its Auxiliaries, Balance of Plant, Operation Assistance in Water Treatment Plant including material handling and Housekeeping of 3x660MW Super Critical Power Plant of M/S Talwandi Sabo Power Limited,Vill. Banwala, Dist. Mansa, Punjab for Five Years. STEAG/TSPL 60 Months Continue…
 2. Operation and maintenance of Boiler, Ash Handling & its Auxiliaries of 3×660 MW Super Critical Thermal Power Plant at Talwandi Sabo, Mansa Punjab. TSPL/Vedanta Group 36 Month Completed
3. Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at HMEL, Bathinda (Punjab). STEAG/HMEL 24 Month Completed

 

JSW

Sr.  No Description of Works Plant / Client Name Duration Status
1 Operation & Maintenance of Ash Handling Plant CPP Unit 3 & 4 (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. JSW 36 Months Continue…
2. Annual Maintenance, Preventive Maintenance & Breakdown Maintenance of Boiler, Turbine and its Auxiliaries CPP- I,II,III,IV & SBU- I,II at 1690 MW JSW Energy Limited, Bellary Karnataka. JSW 36 Month Continue…
3. AMC for Mechanical Preventive Maintenance & Misc. Services of Boiler and Auxiliaries of SBU 2 and CPP3&4 units Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. JSW 24+12 Month Completed
4. AMC for Mechanical Breakdown Maintenance & Misc. Services of Boiler, CHP and Auxiliaries of SUB2 and CPP3&4 Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. JSW 24+12 Month Completed
 5. Annual Overhauling of ESP, APH of SBU #2, CPP3 at 4X300 MW JSW Energy, Bellary  JSW  02 Month Completed
6. Annual Overhauling of Boiler and Turbine with auxiliaries at 4X300 MW JSW Energy, Bellary JSW 02 Month Completed
7. Annual Overhauling of LT Motors at 4X300 MW JSW Energy, Bellary JSW 02 Month Completed

RELIANCE ROSA

Sr.  No Description of Works Plant / Client Name Duration Status
 1. Annual Maintenance Contract of Boiler, Mill & its Auxiliaries of 4×300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh. Reliance Rosa 36 Month Continue…
 2. Annual Overhauling of Boiler Pressure Part, APH, Fans, ESP & Coal burner of Unit 1 & 3 of 4×300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh. Reliance Rosa 01 Month Completed

SEL IPP/ EESI

Sr.  No Description of Works Plant / Client Name Duration Status
1. Complete Maintenance (Routine, Breakdown, Preventive) of Boilers along with its auxiliaries of 4 x 600MWBoilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda SEL IPP/ EESI 52 Months Completed
2. Field Operations of BOP of 4 x 600 MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda SEL IPP/ EESI 42 Month Completed
3. Capital Overhauling of Pressure Parts, Burners, Pent & Dog House, Fans – (ID/FD/PA/SA), Valves, Ducting, Pumps, Compressors, Gates and Dampers etc. of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Months Completed
4. Maintenance for the housekeeping and material management of 4 x 600 MW boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda SEL IPP/ EESI 36 Month Completed
5. Capital Overhauling of ESP & Bag Filters of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Month Completed
6. Capital Overhauling of Coal Mills, Gates & Dampers of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Month Completed
7. Capital Overhauling of Air Pre Heaters of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Month Completed
8. Design, Detailing, Supply of Material, Fabrication, Erection and Assembly of Access & Platforms at 4×600 MW IPP of Sterlite Energy limited at Jharsuguda, Orissa. SEL IPP/ EESI 12 Months Completed

DB POWER

Sr.  No Description of Works Plant / Client Name Duration Status
1 Commissioning Support for Complete Power Plant for Mechanical, Electrical and C&I for BTG, BOP Equipment, Associated Piping, CHP & AHP of 2×600 MW DBPL BADAHARA, Chhattisgarh DB POWER 24 Month Completed  

LANCO POWER CORPORATION

Sr.  No Description of Works Plant / Client Name Duration Status
1 Routine, Preventive, Predictive Maintenance of Boiler, Turbine and Auxiliaries, All Pumps, DM water plant, Fans of Cooling Towers, Fans, Compressors, HFO system, Ash Handling & BOP etc. of 2×600 MW at LANCO Anpara Power Corporation Ltd, Uttar Pradesh. LANCO Anpara Power Corporation Ltd 36+36 Month Continue…
 2. AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd. LANCO-Amarkantak 36 Month Completed

ADANI POWER RAJASTHAN LTD.

Sr.  No Description of Works Plant / Client Name Duration Status
1 Providing Complete mechanical maintenance Service including preventive maintenance, regular maintenance & break down maintenance of Boiler & its Auxiliaries (including ESP), Turbine Auxiliaries and BOP and Boiler tubes weld joints repair for Unit-I & II, Kawai Thermal Power Plant, Rajasthan Adani Power Rajasthan Ltd. 24 Month Continue…

NTPC LIMITED

Sr.  No Description of Works Plant / Client Name Duration Status
1 Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Boiler, Turbine, Air Compressors and AC of Stage-I (3 X 800 MW) Units at NTPC Kudgi, Karnataka NTPC Limited, Kudgi 36 Month Continue…
 2. Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Balance of Plant (BOP) of Stage-I (2 X 800 MW) Units at NTPC Gadarwara NTPC Limited
Gadarwara
36 Month Continue…

ESSAR POWER M.P LIMITED

Sr.  No Description of Works Plant / Client Name Duration Status
1 Annual Mechanical Maintenance of BTG, BOP and AHP for Unit # 1 & Unit # 2 Essar Power M.P Limited 36 Month Continue…
2. Annual overhauling of Boiler Pressure Part, APH, FAN, Coal Burner, Safety valve 2X600 MW Essar Power M.P Limited, Bandhora, Waidhan, M.P Essar Power M.P Limited 1 Month Completed

 

ISGEC

Sr.  No Description of Works Plant / Client Name Duration Status
1. Fabrication of Pressure Vessels and Evaporators. Y’NAGAR/ ISGEC 1..5 Years Completed
 
2.
Fabrication, Assembly, Welding, Pre/Post Weld Treatment and Hydro Testing of Headers. Y’NAGAR/ ISGEC 36 Month Completed 
 
3.
Fabrication of Pressure Parts of High-Pressure Boiler Components i.e. Water Wall Tubes, Economiser, LTSH, Loose Tubes, Panels, Roof Tubes. RATANGARH/ ISGEC 2.5 Years Completed

ICS SENEGAL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Turn around Maintenance of SAP & PAP at 01 MT capacity at ICS-Senegal (International). Includes Piping, Equipment’s(rotary +Static) ICS Senegal 06 Month Completed 

OMPL/TOYO/ THERMAX

Sr.  No Description of Works Plant / Client Name Duration Status
1 Fabrication, Erection, Testing and commission of piping (Executed Qty: – 74000 INM which includes P-91, P-11, 22, SS- 304L, 316L, 310 L,CS)  of combined cycle of 72 MW including commissioning of HRSG, GTG and STG  at OMPL (Petrochemical Complex)  at Mangalore, Karnataka.. OMPL/TOYO/ THERMAX 12 Month Completed
2. Assembly and Erection of steel stack along with Platforms of 74 Mtrs height of 72MW at OMPL, Mangalore, Karnataka (QTY -02 No. stacks). OMPL/TOYO/ THERMAX 03 Month Completed

OCFL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Fabrication, Erection, Testing and Commissioning of Piping along with Rotating Equipment’s includes CS, AS, SS, P91, 904L, LTCS, Rubber Line, Jacketed piping, Cast Iron (5,10,000 Inch Meter) of 2 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL Paradeep Orissa. OCFL 24 Month Completed
2. Assembly, Erection, Testing and Commissioning of Static and Rotating Equipment (Total Weight 19000 MT) of 02 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL, Paradeep, Orissa. OCFL 22 Month Completed

IOCL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Operation & Maintenance of 5 MW solar Photovoltaic Power Plant at IOCL, Rawra Rajasthan IOCL 36 Months Continue…
 2. Mechanical Maintenance of rotary parts on round the clock basis for PNC at IOCL (Refineries Division) Panipat Naphtha Cracker, Panipat, Haryana. IOCL 12 Month Continue…
3. Erection, testing & commissioning of complete sulphur furnace package with burners, Boiler drum, furnaces, IBR & NIBR piping at IOCL, Panipat Refinery. IOCL 06 Month Completed

ISRL

Sr.  No Description of Works Plant / Client Name Duration Status
1 ARC for Supply of Manpower for Rotary Equipment maintenance & Workshop Mechanical Maintenance at ISRL Complex, Panipat, Haryana ISRL,Panipat 36+24 Month Continue…
 2. Service contract for ‘Rotary & Static Equipment Maintenance’ at ISRL Complex, Rubber plant, Panipat, Haryana. ISRL,Panipat 36 Month Continue…

TATA-TPDDDL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Operation & Maintenance services of 1X108 MW Gas based Power Plant at TATA POWER-Rithala Plant, Delhi. TATA-TPDDDL 36 Month Continue…

HINDUSTAN ZINC LIMITED

Sr.  No Description of Works Plant / Client Name Duration Status
1 Operation & Maintenance of Ore Beneficiation Plant of Zinc of 4.7 mm MT of Hindustan Zinc limited Zawar Mines, Udaipur Rajasthan. Hindustan Zinc Limited 36 Month Continue…

DANGOTE REFINERY

Sr.  No Description of Works Plant / Client Name Duration Status
1. Composite Electrical works in upcoming  Oil Refinery including Erection, Testing & commissioning of Transformers, LT/ HT Bus bars, HT/LT Motors, Laying HT/LT Cables & installation of C&I system at Dangote Refinery Nigeria. Dangote Refinery 18 Months Continue…  

RELIANCE JAMNAGAR REFINERY

Sr.  No Description of Works Plant / Client Name Duration Status
1. Piping & Structural Steel works of Mechanical Contract for Additive Dosing tank In DTA RTF.(30000 IND) Reliance Jamnagar 06 Months Completed
2. Stack Height Increase, CFN Piping and Flue Gas Duct jobs at SEZ-FCCU Reliance Industries Limited Jamnagar Gujarat. Reliance Jamnagar 2.5 Month Completed
3. IBR Related Piping Modification/ Inspection Jobs at SEZ-FCCU Area Reliance Industries Limited Jamnagar Gujarat. Reliance Jamnagar 1.5 Months Completed
4. Structural Steel Fabrication/ Mechanical and other related Works at SFS- SEZ, RIL- Jamnagar J3 Project Reliance Jamnagar 30 Month Completed
5. Structural Erection works-MEG area Reliance Jamnagar 08 Month Completed
6. Mechanical structural erection at SEZ PCG area Reliance Jamnagar 01 Year Completed
7. Circular Platform Erection works SEZ-MEG area Reliance Jamnagar 02 Month Completed

RELIANCE SIBUR ELASTOMERS PRIVATE LIMITED

Sr.  No Description of Works Plant / Client Name Duration Status
1. Mechanical Field Works at IIR Butyl Rubber Plant-, Structural Steel Fabrication & Erection, Equipment Erection (Static & Rotary), ABG Piping, Bolt Torqueing etc… Reliance Sibur Elastomers Private Limited 12 Month Continue…
2. UnderGround Piping Works Reliance Sibur Elastomers Private Limited 08 Month Continue…

RELIANCE/ LINDE ENGINEERING INDIA LTD

Sr.  No  Description of Works Plant / Client Name Duration Status
1. Structural, Piping and Equipment(Static & Rotary) Installation Works 5000 MT at Reliance Industries, Jamnagar, SEZ 1 and SEZ 2 Steam Supper Heater Project. Reliance/ Linde Engineering India Ltd 09 Month Completed 