Sr.No | Description of Works | Plant / Client Name | Duration | Status |
---|---|---|---|---|
1. | Composite Electrical works in upcoming Oil Refinery including Erection, Testing & commissioning of Transformers, LT/ HT Bus bars, HT/LT Motors, Laying HT/LT Cables & installation of C&I system at Dangote Refinery Nigeria. | Dangote Refinery | 18 Months | Continue… |
2. | Assembly Erection, Testing & Commissioning of H&M Equipment’s for Kano Hydro Electric Project for Skipper Nigeria Limited, at Tiga Site, Nigeria | Skipper Nigeria Limited | 8 Months | Continue… |
3. | Mechanical Field Works at IIR Butyl Rubber Plant-, Structural Steel Fabrication & Erection, Equipment Erection (Static & Rotary), ABG Piping, Bolt Torqueing etc… | Reliance Sibur Elastomers Private Limited | 12 Months | Continue… |
4. |
Under Ground Piping Works |
Reliance Sibur Elastomers Private Limited | 8 Months | Continue… |
5. | Mechanical Maintenance of rotary parts on round the clock basis for PNC at IOCL (Refineries Division) Panipat Naphtha Cracker, Panipat, Haryana. | IOCL | 12 Months | Continue… |
6. | Structural, Piping and Equipment(Static & Rotary) Installation Works 5000 MT at Reliance Industries, Jamnagar, SEZ 1 and SEZ 2 Steam Supper Heater Project | Reliance/ Linde Engineering India Ltd | 09 Months | Completed |
7. | Piping & Structural Steel works of Mechanical Contract for Additive Dosing tank In DTA RTF.(30000 IND) | Reliance Jamnagar Refinery | 06 Months | Completed |
8. | Stack Height Increase, CFN Piping and Flue Gas
Duct jobs at SEZ-FCCU Reliance Industries Limited Jamnagar Gujarat. |
Reliance Jamnagar Refinery | 2.5 Month | Completed |
9. | IBR Related Piping Modification/ Inspection Jobs at SEZ-FCCU Area Reliance Industries Limited Jamnagar Gujarat. | Reliance Jamnagar Refinery | 1.5 Month | Completed |
10. | Fabrication, Erection, Testing and Commissioning of Piping along with Rotating Equipment’s includes CS,AS,SS,P91, 904L, LTCS, Rubber Line, Jacketed piping, Cast Iron (5,10,000 Inch Meter) of 2 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL Paradeep Orissa | OCFL | 24 Months | Completed |
11. | Fabrication, Erection, Testing and commission of piping (Executed Qty: – 74000 INM which includes P-91, P-11, 22, SS- 304L, 316L, 310 L,CS) of combined cycle of 72 MW including commissioning of HRSG, GTG and STG at OMPL (Petrochemical Complex) at Mangalore, Karnataka. | OMPL/TOYO/ THERMAX | 12 Months | Completed |
12. | Erection, testing & commissioning of complete sulphur furnace package with burners, Boiler drum, furnaces, IBR & NIBR piping at IOCL, Panipat Refinery.
|
IOCL/ISGEC | 06
Months |
Completed |
13. | Structural Steel Fabrication/ Mechanical and other related Works at SFS- SEZ, RIL- Jamnagar J3 Project | Reliance Jamnagar Refinery | 30 Months | Completed |
14. | Structural Erection works-MEG area
|
Reliance Jamnagar | 08 Months | Completed |
15. | Mechanical structural erection at SEZ PCG area | Reliance Jamnagar | 01 Year | Completed |
16. | Circular Platform Erection works SEZ-MEG area | Reliance Jamnagar | 02 Months | Completed |
17. | Turn around Maintenance of SAP & PAP at 01 MT capacity at ICS-Senegal (International). Includes Piping, Equipment’s(rotary +Static) | ICS Senegal | 06 Months | Completed |
18. | Assembly and Erection of steel stack along with Platforms of 74 Mtrs height of 72MW at OMPL, Mangalore, Karnataka (QTY -02 No. stacks). | OMPL/TOYO/ THERMAX | 03 Months | Completed |
19. | Assembly, Erection, Testing and Commissioning of Static and Rotating Equipments(Total Weight 19000 MT) of 02 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL, Paradeep, Orissa | OCFL | 22 Months | Completed |
20. | Fabrication of Pressure Vessels and Evaporators.
|
Y’NAGAR/ ISGEC | 1.5 Years | Completed |
21. | Fabrication, Assembly, Welding, Pre/Post Weld Treatment and Hydro Testing of Headers.
|
Y’NAGAR/ ISGEC | 36 Months | Completed |
22. | Design, Detailing, Supply of Material, Fabrication, Erection and Assembly of Access & Platforms at 4×600 MW IPP of Sterlite Energy limited at Jharsuguda, Orissa. | SEL IPP/ EESI | 12 Months | Completed |
23. | Fabrication of Pressure Parts of High Pressure Boiler Components i.e. Water Wall Tubes, Economiser, LTSH, Loose Tubes, Panels, Roof Tubes. | RATANGARH/ ISGEC | 2.5 Years | Completed |
24. | Fabrication of the secondary structures, Duct, Elevators and Miscellaneous Platforms for 2 x 700 MW Boilers. | LNT-MHI/ FL | 12 Months | Completed |
25. | Fabrication of structures, ducting, Boiler Elevators at 2×600 MW at Reliance 2×600 MW Hisar, Haryana.
|
HPGCL/
Reliance |
12 Months | Completed |
26. | Erection & Commissioning of Mechanical Works For Boiler, ESP, IBR/NIBR Piping and BOP &UNLOADING, STACKING VERIFICATION,STORE MANAGEMENT For 1X20 MW MWV India Packaging Board PVT Ltd Vapi, Gujarat | Thermax/ Vapi | 12 Months | Completed |
27. | Mechanical Erection Work of Boiler, ESP, Piping & auxiliaries including Housekeeping and Material Handling for 1×4.1 MW CPP of NV International Pvt. Ltd. | NV International/Thermax | 12 Months | Completed |
28. | Erection, Testing and Commissioning of complete package of ESP, Milling System, Fans and Ducting of 2 x 250 MW Power Plant at GHTP, Lehra Mohabat , PSEB, Bathinda Punjab | PSEB | 24 Months | Completed |
29. | Complete Erection, Testing, Trail Assembly, Commissioning of Sky Climber of 2 x 600 MW Power Plant at RGTPP, Hisar Haryana | HPGCL/REL | 02 Months | Completed |
30. | Assistance in Operations, Commissioning & Stabilization of 2 x 600 MW Boiler, Turbine, BOP, Electrical and C&I at RGTP, Hisar | RGTPP/REL | 12 Months | Completed |
31. | Assistance in Operations, Commissioning & Stabilization of 2 x 300 MW Boiler, Turbine, BOP, Electrical, C&I at DCRTPS Y’Nagar | DCRTPS/REL | 12 Months | Completed |
32. | Erection, Testing & Commissioning of 1×170 TPH CFBC Boiler, IBR Piping, Fans, Ducting, APH etc. at Rewa. | JAYPEE | 18 Months | Completed |
33. | Erection & Alignment of Structure of lift for Unit – 1 including Sheeting of 2×600 MW at RGTPP, Hisar
|
RGTPP/REL | 05 Months | Completed |
34. | Erection, Testing & Commissioning of 12 MW Travelling Grate Boiler with IBR Piping, Cooling Water Piping, Raw Water Piping, DM Water Piping, ESP, Fans, APH, Ducting etc. | PBPL/ PBPL | 16 Months | Completed |
35. | Erection of the Balance Structure and Piping (IBR& NIBR) work for Unit – 1 & 2 of 2 x 600 MW. | RGTPP/
HISSAR |
08 Months | Completed |
36. |
Modification of the Structure including addition of Landing Platform at different level for Unit – 1 & 2 of 2 x 600 MW |
RGTPP/ HISAR |
06 Months |
Completed |
37. | Complete Work of Dust Suppression System of 4 x 110MW and 2 x 250 MW work including Civil Works, Erection & Commissioning of Pumps which also includes laying Underground Piping with Wrapping and Coating & Commissioning of complete DSS at Panipat | HPGCL/WRC | 12 Months | Completed |
38. | Erection, Testing and Commissioning and Allied Works (Including Housekeeping and Material Management) along with Power Cycle and Utility for 10 MW Waste Heat Recovery CPP at JK Cement, Chitourgarh, Rajasthan | JK Cement/
Thermax |
12 Months | Completed |
39. | Resolving Operation problems including proposing modifications of 4 x 135 MW, CFBC Boilers at DCPP, JSPL, Raigarh | JSPL | 01 Month | Completed |
40. | Erection, Testing & Commissioning of 1×120 TPH Travelling Grate Boiler, IBR Piping, Fans, Ducting, APH at Khatauli in Uttar Pradesh | TRIVENI/IJT | 11 Months | Completed |
41. | Erection, Testing & Commissioning of 1×47 TPH Travelling Grate Boiler, Ducting, APH, ESP, IBR Piping in Rajasthan | SANJOG SUGARS/ IJT | 06 Months | Completed |
42. | Fabrication, Painting, Erection, Welding, Alignment of Turbine with auxiliaries and Pipe Rack Structure of Fuel handling system of 2 x 250 MW at Panipat | HPGCL/ INDURE | 08 Months | Completed |
43. | Complete Package of Fuel Handling system with Piping IBR /NON IBR including Processed Piping with Pumps and Oil Tanks of HFO /LDO Tanks with Steam Heaters of 2 x 250 MW at Panipat | HPGCL/
Utility |
09 Months | Completed |