JSW Energy Limited
M/s. Simar Infrastructure Limited mobilized adequate technical manpower and shown great mobilization ability.
M/s. Simar has completed all overhauling activities within a stipulated time period and entirely to our satisfaction.
M/s. Simar performance has been outstanding. We wish them success in the future.
Reliance Industries Limited
Our heartiest congratulations on the completion of MIS Simar Infra’s vibrant, productive and fruitful One year in RIL-SFS. Following Achievements have been done by M/s Simar in One year.
• Ws Simar Infra has been completed 4486 MT Structure Fabrication till the date.
• Only One MTC has been Reported till the date.
• 3 Nos. Drawings are completed till today Now required more attention for drawing completion.
Reliance Infrastructure Ltd.
Based on our experience by working with this company, we feel confident in assigning any jobs to simar as whatsoever jobs assigned to them, they took the challenge with full dedication and devotion and completed the jobs with our full satisfaction Maybe tried at other locations of our company also if economically also they compete with other vendors.
Udupi Power Corporation Limited
During the last Saturday’s outage due to steam leakage in U#I boiler, the repair work was executed and completed as per our expectations. During the work, resources were well organised and the will to complete the job as early as possible was demonstrated by your staff. We hereby acknowledge the good work done by you and hope that the same spirit will continue in future also in day to day jobs as well as in shut down jobs.

