| Sr. No |
Description of Works |
Plant / Client Name |
Duration |
Status |
| 1 |
Annual Mechanical Maintenance & Operations of Boiler Turbine Generator & BOP of 4×135 MW power plants at DCPP of JSPL at Dongamuha, Raigarh. |
JSPL |
12 Months |
Continue… |
| 2. |
Misc. work During Overhauling including Vortex Plate & APH tube replacement in 4 x135 MW JSPL, Korba, CG. |
JSPL |
01 Month |
Completed |
| 3. |
Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL, Raighar. |
JSPL |
02 Month |
Completed |
| 4. |
Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For 135 MW Power Plant at Angul, Orissa. |
JSPL |
1.5 Month |
Completed |
| 5. |
Annual Overhauling of Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. |
JSPL |
01 Month |
Completed |
| 6. |
Annual Overhauling and Annual Maintenance of Boiler, Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. |
JSPL |
01 Month |
Completed |
| 7. |
Resolving Operation problems including proposing modifications of 4 x 135 MW, CFBC Boilers at DCPP, JSPL, Raigarh |
JSPL |
01 Month |
Completed |