Sr.  No Description of Works Plant / Client Name Duration Status
1 Annual Mechanical Maintenance & Operations of Boiler Turbine Generator & BOP of 4×135 MW power plants at DCPP of JSPL at Dongamuha, Raigarh. JSPL 12 Months Continue…
2. Misc. work During Overhauling including Vortex Plate & APH tube replacement in 4 x135 MW JSPL, Korba, CG. JSPL 01 Month Completed
3. Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL, Raighar. JSPL 02 Month Completed
4. Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc.  For 135 MW Power Plant at Angul, Orissa. JSPL 1.5 Month Completed
 5. Annual Overhauling of Boiler   Pressure Parts, IBR HP Valve, BED Nozzles etc.  For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. JSPL 01 Month Completed
6. Annual Overhauling and Annual Maintenance of Boiler, Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc.  For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. JSPL 01 Month Completed
7. Resolving Operation problems including proposing modifications of 4 x 135 MW, CFBC Boilers at DCPP, JSPL, Raigarh JSPL 01 Month Completed