• 218, Virat Nagar, Panipat, Haryana 132103

SKIPPER NIGERIA LIMITED

Sr.  No Description of Works Plant / Client Name Duration Status
1. Assembly Erection, Testing & Commissioning of H&M Equipment’s for Kano Hydro Electric Project for Skipper Nigeria Limited, at Tiga Site, Nigeria Skipper Nigeria Limited 08 Months Continue…  
Read More

NPL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Commissioning Support for Mechanical Maintenance Work of Power Plant Equipment’s, Piping, Valves etc. at 2×700 MW NPL Rajpura, Punjab NPL 06 Months Completed   
2. Operation & Maintenance Services of Ash Handling Plant (AHP), Mill Reject System (MRS) and Recovery system WRS at 2X700 MW Nabha Power Limited.

 

L&T Nabha Power. 12+24 Month Continue…
Read More

JSW/BELLARY

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of SBU 2, 2×300 MW . JSW/Bellary 09 Days Completed   
2. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of CPP3, 2×300 MW. JSW/Bellary 45 Days Completed   
3. Annual Overhauling of Turbine, Boiler and its Auxiliaries, APH & Fans with auxiliaries at CPP 2 at JSW Energy, Bellary. JSW/Bellary 01 Months Completed   
Read More

ACBIL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhauling of Turbine & Auxiliaries of Unit 1 & 2 at 2x 135 MW, ACBIL, Kasaipali, Chhattisgarh. ACBIL 01 Months Completed   
2. Annual Contract for Operation & Maintenance of Boiler & its auxiliaries, Turbine auxiliaries, CHP, AHP, WTP and BOP at        2x50MW Spectrum Coal & power limited, Chhattisgarh. ACB-Spectrum Coal & Power 12+12 Months Completed   
Read More

MCCPL,CG

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Inspection and correction of Turbine bearing no. 01 to 09, alignment of MOP & Bearing gear at 1x 300 MW MCCPL, Bandhakhar, and Chhattisgarh. MCCPL, CG 01 Months Completed   
2. Maintenance works for Electrical and Control & Instrumentation of 1×300 MW Thermal Power Plant. Maruti Clean & Coal power Ltd 12 Months Completed   
Read More

TSPL, PUNJAB

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 1 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. TSPL, Punjab 01 Months Completed   
2. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. TSPL, Punjab 01 Months Completed   
3. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. TSPL, Punjab 02 Months Completed   
Read More

TATA POWER-CGPL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhauling of Boiler & its auxiliaries of Unit #40 & Unit # 50  at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra TATA POWER -CGPL 06 Months Continue…   
2. Annual Overhauling of Boiler & its auxiliaries of Unit #40  at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra TATA POWER -CGPL 02 Months Completed   

 

Read More

HPGCL

 

 

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2×300 MW at Unit – 1&2. DCRTPP/HPGCL 15 Months Completed   
2. Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2×300 MW at Unit – 1&2. DCRTPP/HPGCL 15 Months Completed   
3. Complete Maintenance of Coal Mills, RC Feeders of 2 x 600 MW Boiler at Unit–1&2 at RGTPP/HISAR HPGCL/ HISAR 15 Months Completed   
4. Assistance in Operations, Commissioning & Stabilization of 2 x 600 MW Boiler, Turbine, BOP, Electrical and C&I at RGTP, Hisar HPGCL/ HISAR 12 Months Completed   
5. Erection & Alignment of Structure of lift for Unit – 1 including Sheeting of 2×600 MW at RGTPP, Hisar HPGCL/ HISAR 05 Months Completed   
6. Erection of the Balance Structure and Piping (IBR& NIBR) work for Unit – 1 & 2 of 2 x 600 MW at RGTPP, Hisar HPGCL/ HISAR 08 Months Completed   
7. Modification of the Structure including the addition of Landing Platform at a different level for Unit – 1 & 2 of 2 x 600 MW at RGTPP, Hisar HPGCL/ HISAR 06 Months Completed   
8. Replacement of Support/Guide Bearing of APH of 2 x 600 MW at Hisar. HPGCL/HISAR 01 Months Completed   
9. Fabrication of structures, ducting, Boiler Elevators at 2×600 MW at Reliance 2×600 MW Hisar, Haryana. HPGCL/HISAR 12 Months Completed   
10. Complete Erection, Testing, Trail Assembly, Commissioning of Sky Climber of 2 x 600 MW Power Plant at RGTPP, Hisar Haryana HPGCL/HISAR 02 Months Completed   
11. Complete Work of Dust Suppression System of 4 x 110MW and 2 x 250 MW work including Civil Works, Erection & Commissioning of Pumps which also includes laying Underground Piping with Wrapping and Coating & Commissioning of complete DSS. HPGCL/HISAR 12 Months Completed   
12. Fabrication, Painting, Erection, Welding, Alignment of Turbine with auxiliaries and Pipe Rack Structure of  Fuel handling system of 2 x 250 MW at Panipat. HPGCL/PANIPAT 08 Months Completed   
13. Complete Package of Fuel Handling system with Piping IBR /NON-IBR including Processed Piping with Pumps and Oil Tanks of HFO /LDO Tanks with Steam Heaters of 2 x 250 MW at Panipat. HPGCL/PANIPAT 09 Months Completed   
14. Annual Overhauling of Pressure Parts of Boiler unit #1 and Unit #2 at 2×600 MW CLP Jhajjar- Haryana CLP/JHAJJAR 02 Months Completed   
15. Annual Overhauling of APH & Fans of unit #1 at 2×600 MW CLP Jhajjar- Haryana CLP/JHAJJAR 01 Months Completed   
16. Assistance in Operations, Commissioning & Stabilization of 2 x 300 MW Boiler, Turbine, BOP, Electrical, C&I at DCRTPS Y’Nagar DCRTPS/REL 12 Months Completed

 

Read More

PTPS/HPGCL

 

Sr.  No Description of Works Plant / Client Name Duration Status
1 Maintenance of all Equipment’s of Conveyor System (Routine & Breakdown) & Heavy Equipment’s of Coal Handling Plant – II of 2 x 210 MW PTPS-HPGCL, Panipat Haryana PTPS/HPGCL 07 Months Completed
2. Complete Mechanical Maintenance of Types of equipment of Conveyor System of Coal Handling Plant-I of 4 x 110 MW Boilers.  

PTPS/HPGCL

 

24 Month

Completed
3. Complete Mechanical Maintenance of Crusher, RDM, Wagon Tippler, Motors, and other Allied Equipment’s installed at CHP-II of 2 x210 MW PTPS-HPGCL, Panipat Haryana. PTPS/HPGCL 15 Month Completed
4. Complete Maintenance of Tube Coal Mills, RC Feeders & Vibrators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 6 PTPS/HPGCL 15 Month Completed
 

5.

Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit – 1 & 2. PTPS/HPGCL 15 Month Completed
6. Complete Maintenance of Coal Mills, RC Feeders & Variations & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 PTPS/HPGCL 15 Month Completed
7. Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit 1 & 2. PTPS/HPGCL 15 Month Completed
8. Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment’s of Unit – 7&8 PTPS/HPGCL 15 Months Completed
9. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Unit  2×250 MW – 7&8 PTPS/HPGCL 15 Month Completed
10. Routine/Breakdown/ Capital Maintenance of all Electrical &Electronics (C&I) Equipment  of Unit –7&8 of 2×250 MW PTPS/HPGCL 15 Month Completed
11. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of CHP-II of 2×210 MW Boilers PTPS/HPGCL 07 Month Completed
12. Maintenance / Replacement of Fabric / Conveyor Belt Compensators over existing Metallic Expansion Joints of Boiler of 110 MW at Unit -2 PTPS/HPGCL 04 Month Completed
13. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 5 of 210 MW capacity at PTPS, Panipat PTPS/HPGCL 01 Month Completed
14. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 4 of 110 MW capacity at PTPS, Panipat PTPS/HPGCL 01 Months Completed
15. Capital Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6 PTPS/HPGCL 01 Month Completed
16. Overhauling of complete Pressure Parts, Pent House, APH of 110 MW Boiler at Unit-2 PTPS/HPGCL 01 Month Completed
17. Overhauling of Pressure Parts, Cleaning, Washing & Repairing of the Pent House of 110 MW Boiler at Unit – 3 PTPS/HPGCL 01 Month Completed
 

18.

Overhauling of RAH, ESP, Gates & Dampers, various Ducts of 210 MW Boiler at Unit-5 PTPS/HPGCL 01 Month Completed
19. Repair/Rectification of 6 Nos. Damaged ESP Fields / ESP Structure along with Replacement of the Slide Bearing of 210 MW Boiler at Unit-6 PTPS/HPGCL 01 Month Completed
20. Overhauling of Instrument Air Compressor of 110 MW Boiler at Unit-2 PTPS/HPGCL 01 Month Completed
21. Operation and Maintenance of complete Coal Handling Plant – II of 2×210 MW, PTPS-HPGCL, Panipat Haryana PTPS / TECPRO 07 Month Completed
 

22.

Operation & Maintenance of Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal handling Plant – III of 2×250 MW, PTPS-HPGCL, Panipat Haryana. PTPS / TECPRO 07 Month Completed
23. Renovation & Modernization of Conveyor Belts by replacing existing Toughing Idlers frame with Rollers, Flat Return Idlers, Toughing Training Idlers, Return Training Idlers & Impact Idlers of 20 Toughing Angle with 35 Toughing Angle Idlers & replacement of Vibrating Feeders, Flap Gates, Transfer Chutes of Coal Handling Plant – I of 4 x 110 MW, PTPS-HPGCL, Panipat Haryana. PTPS/RMEC 06 Months Completed   
24. Routine, Breakdown & Capital Maintenance of all Electrical & Electronics (C&I) Types of equipment in CHP-II of 2 x 210 MW Boilers. PTPS/RMEC 15 Months Completed   
25. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal Handling Plant – III of 2×250 MW PTPS/RMEC 15 Months Completed   
26. Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6 PTPS/RMEC 01 Months Completed   
27. Complete Maintenance of Coal Mills, RC Feeders & Variations & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 PTPS 15 Months Completed   
28. Capital overhauling of unit-3 of 110Mw at PTPS Panipat complete pressure parts. PTPS 1.5 Month Completed   

 

Read More

KEC International

Sr.  No Description of Works Plant / Client Name Duration Status
1 Operation & Maintenance of 1 X 18 MW solar Power Plant orf KEC International at Jalaun, Uttar Pradesh. KEC International 36 Months  

Completed   

Read More