SANJOG SUGARS/ IJT

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection, Testing & Commissioning of 1×47 TPH Travelling Grate Boiler, Ducting, APH, ESP, IBR Piping in Rajasthan. SANJOG SUGARS/ IJT 06 Months Completed
Read More

TRIVENI/IJT

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection, Testing & Commissioning of 1×120 TPH Travelling Grate Boiler, IBR Piping, Fans, Ducting, APH at Khatauli in Uttar Pradesh TRIVENI/IJT 11 Months Completed
Read More

PBPL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection, Testing & Commissioning of 12 MW Travelling Grate Boiler with IBR Piping, Cooling Water Piping, Raw Water Piping, DM Water Piping, ESP, Fans, APH, Ducting etc. PBPL 16 Months Completed
Read More

JAYPEE

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection, Testing & Commissioning of 1×170 TPH CFBC Boiler, IBR Piping, Fans, Ducting, APH etc. at Rewa. JAYPEE 18 Months Completed
Read More

THERMAX

Sr.  No Description of Works Plant / Client Name Duration Status
1. Erection & Commissioning of Mechanical Works For Boiler, ESP, IBR/NIBR Piping and BOP &UNLOADING, STACKING VERIFICATION,STORE MANAGEMENT For 1X20 MW MWV India Packaging Board PVT Ltd Vapi, Gujarat MWV India Packaging Board PVT Ltd Vapi, Gujarat 12 Months Completed
 
2.
Mechanical Erection Work of Boiler, ESP, Piping & auxiliaries including Housekeeping and Material Handling for 1×4.1 MW CPP of NV International Pvt. Ltd. NV International/Thermax 12 Month Completed 
 
3.
Erection, Testing and Commissioning and Allied Works (Including Housekeeping and Material Management) along with Power Cycle and Utility for 10 MW Waste Heat Recovery CPP at JK Cement, Chitourgarh, Rajasthan JK Cement/ Thermax 12 Months Completed
Read More

LNT-MHI/FL

Sr. No Description of Works Plant / Client Name Duration Status
1. Fabrication of the secondary structures, Duct, Elevators and Miscellaneous Platforms for 2 x 700 MW Boilers. LNT-MHI/FL 12 Months Completed
Read More

PSEB

Sr.  No Description of Works Plant / Client Name Duration Status
1. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit -4 PSEB/PCP 01 Months Completed   
2. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit 5 PSEB/PCP 01 Months Completed   
3. Erection, Testing and Commissioning of the complete package of ESP, Milling System, Fans and Ducting of 2 x 250 MW Power Plant at GHTP, Lehra Mohabat, PSEB, Bathinda Punjab PSEB 24 Months Completed
4. Annual turbine, Generator overhauling of Unit -II & IV at Guru Gobind Singh Thermal Power Station, Rupnagar, Punjab. GGSSTTP 01 Months Completed   
Read More

JSW/BELLARY

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of SBU 2, 2×300 MW . JSW/Bellary 09 Days Completed   
2. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of CPP3, 2×300 MW. JSW/Bellary 45 Days Completed   
3. Annual Overhauling of Turbine, Boiler and its Auxiliaries, APH & Fans with auxiliaries at CPP 2 at JSW Energy, Bellary. JSW/Bellary 01 Months Completed   
Read More

KFCL, KANPUR

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Services for erection & commissioning of the Drum Belt at KFCL, JAIPRAKASH ASSOCIATES LIMITED. KFCL,Kanpur 02 Months Completed  
Read More

MCCPL,CG

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Inspection and correction of Turbine bearing no. 01 to 09, alignment of MOP & Bearing gear at 1x 300 MW MCCPL, Bandhakhar, and Chhattisgarh. MCCPL, CG 01 Months Completed   
2. Maintenance works for Electrical and Control & Instrumentation of 1×300 MW Thermal Power Plant. Maruti Clean & Coal power Ltd 12 Months Completed   
Read More