SANJOG SUGARS/ IJT
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Erection, Testing & Commissioning of 1×47 TPH Travelling Grate Boiler, Ducting, APH, ESP, IBR Piping in Rajasthan. | SANJOG SUGARS/ IJT | 06 Months | Completed |
TRIVENI/IJT
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Erection, Testing & Commissioning of 1×120 TPH Travelling Grate Boiler, IBR Piping, Fans, Ducting, APH at Khatauli in Uttar Pradesh | TRIVENI/IJT | 11 Months | Completed |
PBPL
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Erection, Testing & Commissioning of 12 MW Travelling Grate Boiler with IBR Piping, Cooling Water Piping, Raw Water Piping, DM Water Piping, ESP, Fans, APH, Ducting etc. | PBPL | 16 Months | Completed |
JAYPEE
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Erection, Testing & Commissioning of 1×170 TPH CFBC Boiler, IBR Piping, Fans, Ducting, APH etc. at Rewa. | JAYPEE | 18 Months | Completed |
THERMAX
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Erection & Commissioning of Mechanical Works For Boiler, ESP, IBR/NIBR Piping and BOP &UNLOADING, STACKING VERIFICATION,STORE MANAGEMENT For 1X20 MW MWV India Packaging Board PVT Ltd Vapi, Gujarat | MWV India Packaging Board PVT Ltd Vapi, Gujarat | 12 Months | Completed |
| 2. |
Mechanical Erection Work of Boiler, ESP, Piping & auxiliaries including Housekeeping and Material Handling for 1×4.1 MW CPP of NV International Pvt. Ltd. | NV International/Thermax | 12 Month | Completed |
| 3. |
Erection, Testing and Commissioning and Allied Works (Including Housekeeping and Material Management) along with Power Cycle and Utility for 10 MW Waste Heat Recovery CPP at JK Cement, Chitourgarh, Rajasthan | JK Cement/ Thermax | 12 Months | Completed |
LNT-MHI/FL
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Fabrication of the secondary structures, Duct, Elevators and Miscellaneous Platforms for 2 x 700 MW Boilers. | LNT-MHI/FL | 12 Months | Completed |
PSEB
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit -4 | PSEB/PCP | 01 Months | Completed |
| 2. | Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit 5 | PSEB/PCP | 01 Months | Completed |
| 3. | Erection, Testing and Commissioning of the complete package of ESP, Milling System, Fans and Ducting of 2 x 250 MW Power Plant at GHTP, Lehra Mohabat, PSEB, Bathinda Punjab | PSEB | 24 Months | Completed |
| 4. | Annual turbine, Generator overhauling of Unit -II & IV at Guru Gobind Singh Thermal Power Station, Rupnagar, Punjab. | GGSSTTP | 01 Months | Completed |
JSW/BELLARY
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of SBU 2, 2×300 MW . | JSW/Bellary | 09 Days | Completed |
| 2. | Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of CPP3, 2×300 MW. | JSW/Bellary | 45 Days | Completed |
| 3. | Annual Overhauling of Turbine, Boiler and its Auxiliaries, APH & Fans with auxiliaries at CPP 2 at JSW Energy, Bellary. | JSW/Bellary | 01 Months | Completed |
KFCL, KANPUR
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Services for erection & commissioning of the Drum Belt at KFCL, JAIPRAKASH ASSOCIATES LIMITED. | KFCL,Kanpur | 02 Months | Completed |
MCCPL,CG
| Sr. No | Description of Works | Plant / Client Name | Duration | Status |
| 1. | Inspection and correction of Turbine bearing no. 01 to 09, alignment of MOP & Bearing gear at 1x 300 MW MCCPL, Bandhakhar, and Chhattisgarh. | MCCPL, CG | 01 Months | Completed |
| 2. | Maintenance works for Electrical and Control & Instrumentation of 1×300 MW Thermal Power Plant. | Maruti Clean & Coal power Ltd | 12 Months | Completed |