• 218, Virat Nagar, Panipat, Haryana 132103

TSPL, PUNJAB

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 1 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. TSPL, Punjab 01 Months Completed   
2. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. TSPL, Punjab 01 Months Completed   
3. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. TSPL, Punjab 02 Months Completed   
Read More

TATA POWER-CGPL

Sr.  No Description of Works Plant / Client Name Duration Status
1. Annual Overhauling of Boiler & its auxiliaries of Unit #40 & Unit # 50  at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra TATA POWER -CGPL 06 Months Continue…   
2. Annual Overhauling of Boiler & its auxiliaries of Unit #40  at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra TATA POWER -CGPL 02 Months Completed   

 

Read More

HPGCL

 

 

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2×300 MW at Unit – 1&2. DCRTPP/HPGCL 15 Months Completed   
2. Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2×300 MW at Unit – 1&2. DCRTPP/HPGCL 15 Months Completed   
3. Complete Maintenance of Coal Mills, RC Feeders of 2 x 600 MW Boiler at Unit–1&2 at RGTPP/HISAR HPGCL/ HISAR 15 Months Completed   
4. Assistance in Operations, Commissioning & Stabilization of 2 x 600 MW Boiler, Turbine, BOP, Electrical and C&I at RGTP, Hisar HPGCL/ HISAR 12 Months Completed   
5. Erection & Alignment of Structure of lift for Unit – 1 including Sheeting of 2×600 MW at RGTPP, Hisar HPGCL/ HISAR 05 Months Completed   
6. Erection of the Balance Structure and Piping (IBR& NIBR) work for Unit – 1 & 2 of 2 x 600 MW at RGTPP, Hisar HPGCL/ HISAR 08 Months Completed   
7. Modification of the Structure including the addition of Landing Platform at a different level for Unit – 1 & 2 of 2 x 600 MW at RGTPP, Hisar HPGCL/ HISAR 06 Months Completed   
8. Replacement of Support/Guide Bearing of APH of 2 x 600 MW at Hisar. HPGCL/HISAR 01 Months Completed   
9. Fabrication of structures, ducting, Boiler Elevators at 2×600 MW at Reliance 2×600 MW Hisar, Haryana. HPGCL/HISAR 12 Months Completed   
10. Complete Erection, Testing, Trail Assembly, Commissioning of Sky Climber of 2 x 600 MW Power Plant at RGTPP, Hisar Haryana HPGCL/HISAR 02 Months Completed   
11. Complete Work of Dust Suppression System of 4 x 110MW and 2 x 250 MW work including Civil Works, Erection & Commissioning of Pumps which also includes laying Underground Piping with Wrapping and Coating & Commissioning of complete DSS. HPGCL/HISAR 12 Months Completed   
12. Fabrication, Painting, Erection, Welding, Alignment of Turbine with auxiliaries and Pipe Rack Structure of  Fuel handling system of 2 x 250 MW at Panipat. HPGCL/PANIPAT 08 Months Completed   
13. Complete Package of Fuel Handling system with Piping IBR /NON-IBR including Processed Piping with Pumps and Oil Tanks of HFO /LDO Tanks with Steam Heaters of 2 x 250 MW at Panipat. HPGCL/PANIPAT 09 Months Completed   
14. Annual Overhauling of Pressure Parts of Boiler unit #1 and Unit #2 at 2×600 MW CLP Jhajjar- Haryana CLP/JHAJJAR 02 Months Completed   
15. Annual Overhauling of APH & Fans of unit #1 at 2×600 MW CLP Jhajjar- Haryana CLP/JHAJJAR 01 Months Completed   
16. Assistance in Operations, Commissioning & Stabilization of 2 x 300 MW Boiler, Turbine, BOP, Electrical, C&I at DCRTPS Y’Nagar DCRTPS/REL 12 Months Completed

 

Read More

PTPS/HPGCL

 

Sr.  No Description of Works Plant / Client Name Duration Status
1 Maintenance of all Equipment’s of Conveyor System (Routine & Breakdown) & Heavy Equipment’s of Coal Handling Plant – II of 2 x 210 MW PTPS-HPGCL, Panipat Haryana PTPS/HPGCL 07 Months Completed
2. Complete Mechanical Maintenance of Types of equipment of Conveyor System of Coal Handling Plant-I of 4 x 110 MW Boilers.  

PTPS/HPGCL

 

24 Month

Completed
3. Complete Mechanical Maintenance of Crusher, RDM, Wagon Tippler, Motors, and other Allied Equipment’s installed at CHP-II of 2 x210 MW PTPS-HPGCL, Panipat Haryana. PTPS/HPGCL 15 Month Completed
4. Complete Maintenance of Tube Coal Mills, RC Feeders & Vibrators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 6 PTPS/HPGCL 15 Month Completed
 

5.

Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit – 1 & 2. PTPS/HPGCL 15 Month Completed
6. Complete Maintenance of Coal Mills, RC Feeders & Variations & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 PTPS/HPGCL 15 Month Completed
7. Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit 1 & 2. PTPS/HPGCL 15 Month Completed
8. Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment’s of Unit – 7&8 PTPS/HPGCL 15 Months Completed
9. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Unit  2×250 MW – 7&8 PTPS/HPGCL 15 Month Completed
10. Routine/Breakdown/ Capital Maintenance of all Electrical &Electronics (C&I) Equipment  of Unit –7&8 of 2×250 MW PTPS/HPGCL 15 Month Completed
11. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of CHP-II of 2×210 MW Boilers PTPS/HPGCL 07 Month Completed
12. Maintenance / Replacement of Fabric / Conveyor Belt Compensators over existing Metallic Expansion Joints of Boiler of 110 MW at Unit -2 PTPS/HPGCL 04 Month Completed
13. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 5 of 210 MW capacity at PTPS, Panipat PTPS/HPGCL 01 Month Completed
14. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 4 of 110 MW capacity at PTPS, Panipat PTPS/HPGCL 01 Months Completed
15. Capital Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6 PTPS/HPGCL 01 Month Completed
16. Overhauling of complete Pressure Parts, Pent House, APH of 110 MW Boiler at Unit-2 PTPS/HPGCL 01 Month Completed
17. Overhauling of Pressure Parts, Cleaning, Washing & Repairing of the Pent House of 110 MW Boiler at Unit – 3 PTPS/HPGCL 01 Month Completed
 

18.

Overhauling of RAH, ESP, Gates & Dampers, various Ducts of 210 MW Boiler at Unit-5 PTPS/HPGCL 01 Month Completed
19. Repair/Rectification of 6 Nos. Damaged ESP Fields / ESP Structure along with Replacement of the Slide Bearing of 210 MW Boiler at Unit-6 PTPS/HPGCL 01 Month Completed
20. Overhauling of Instrument Air Compressor of 110 MW Boiler at Unit-2 PTPS/HPGCL 01 Month Completed
21. Operation and Maintenance of complete Coal Handling Plant – II of 2×210 MW, PTPS-HPGCL, Panipat Haryana PTPS / TECPRO 07 Month Completed
 

22.

Operation & Maintenance of Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal handling Plant – III of 2×250 MW, PTPS-HPGCL, Panipat Haryana. PTPS / TECPRO 07 Month Completed
23. Renovation & Modernization of Conveyor Belts by replacing existing Toughing Idlers frame with Rollers, Flat Return Idlers, Toughing Training Idlers, Return Training Idlers & Impact Idlers of 20 Toughing Angle with 35 Toughing Angle Idlers & replacement of Vibrating Feeders, Flap Gates, Transfer Chutes of Coal Handling Plant – I of 4 x 110 MW, PTPS-HPGCL, Panipat Haryana. PTPS/RMEC 06 Months Completed   
24. Routine, Breakdown & Capital Maintenance of all Electrical & Electronics (C&I) Types of equipment in CHP-II of 2 x 210 MW Boilers. PTPS/RMEC 15 Months Completed   
25. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal Handling Plant – III of 2×250 MW PTPS/RMEC 15 Months Completed   
26. Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6 PTPS/RMEC 01 Months Completed   
27. Complete Maintenance of Coal Mills, RC Feeders & Variations & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 PTPS 15 Months Completed   
28. Capital overhauling of unit-3 of 110Mw at PTPS Panipat complete pressure parts. PTPS 1.5 Month Completed   

 

Read More

KEC International

Sr.  No Description of Works Plant / Client Name Duration Status
1 Operation & Maintenance of 1 X 18 MW solar Power Plant orf KEC International at Jalaun, Uttar Pradesh. KEC International 36 Months  

Completed   

Read More

UPCL

Sr.  No Description of Works Plant / Client Name Duration Status
1 AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd. UPCL 24 Months Completed   
Read More

NPCIL

 

Sr.  No Description of Works Plant / Client Name Duration Status
1. Service Contract for Supervisory assistance, Computerisation Work, Dispensary assistance & office assistance task in day-to-day function at GHAVP site and its associated infrastructures/Office and Other Location for 18 Months NPCIL/GHAVP 18 Month Completed  
2. Operation and Maintenance of construction power supply system at GHAVP site & at its proposed infrastructure facilities for 2 years.” Nuclear Power Corporation of India Limited 24 Month Continue…
Read More

JSPL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Annual Mechanical Maintenance & Operations of Boiler Turbine Generator & BOP of 4×135 MW power plants at DCPP of JSPL at Dongamuha, Raigarh. JSPL 12 Months Continue…
2. Misc. work During Overhauling including Vortex Plate & APH tube replacement in 4 x135 MW JSPL, Korba, CG. JSPL 01 Month Completed
3. Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL, Raighar. JSPL 02 Month Completed
4. Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc.  For 135 MW Power Plant at Angul, Orissa. JSPL 1.5 Month Completed
 5. Annual Overhauling of Boiler   Pressure Parts, IBR HP Valve, BED Nozzles etc.  For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. JSPL 01 Month Completed
6. Annual Overhauling and Annual Maintenance of Boiler, Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc.  For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. JSPL 01 Month Completed
7. Resolving Operation problems including proposing modifications of 4 x 135 MW, CFBC Boilers at DCPP, JSPL, Raigarh JSPL 01 Month Completed

 

Read More

Jang-e-Azadi

Sr.  No Description of Works Plant / Client Name Duration Status
1 Selection of Contractor for Providing Facility Management Service for Jang-e-Azadi Memorial Project at Kartarpur Jang-e-Azadi 12+12 Month Continue…
Read More

GVK

Sr.  No Description of Works Plant / Client Name Duration Status
1 Complete Operation & Maintenance Services for BTG, BOP, SwitchYard, Electrical and C&I and Auxiliaries including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at Goindwal Sahib, Punjab. GVK 36 Month Continue…
 2. Field operations of Boiler, Coal Mills, Fans, DM Plant, FOPH, CW/ RW / FF / SW / PW/ ETP/ STP, Turbine & its Auxiliaries, ESP, Ash Handling Plant, SwitchYard, Switch Gears including HT / LT System etc.  of 2 x 270 MW Power Plant at Goindwal Sahib, Punjab. GVK 36 Month Completed

 

 

Read More