TRN Energy Limited

Sr.  No Description of Works Plant / Client Name Duration Status
1 Maintenance Contract of BTG & Mill Reject System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po- Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

 

TRN Energy  Limited 36 Months Continue…
2. Maintenance Work For Electrical and C & I at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

 

TRN Energy  Limited 36 Month Continue…
3. Annual Service Contract for Maintenance of Main Plant and Plant Water System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

 

TRN Energy  Limited 12 Month Completed
4. Operation & Maintenance of Ash Handling Plant at 2 X 300 MW TRN Energy Pvt.Ltd, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

 

TRN Energy  Limited 12 Month Completed
Read More

STEAG/TSPL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Annual Mechanical Maintenance Contract for Boiler & its Auxiliaries, TG & its Auxiliaries, Balance of Plant, Operation Assistance in Water Treatment Plant including material handling and Housekeeping of 3x660MW Super Critical Power Plant of M/S Talwandi Sabo Power Limited,Vill. Banwala, Dist. Mansa, Punjab for Five Years.

 

STEAG/TSPL 60 Months Continue…
 

2.

Operation and maintenance of Boiler, Ash Handling & its Auxiliaries of 3×660 MW Super Critical Thermal Power Plant at Talwandi Sabo, Mansa Punjab.

 

 

TSPL/Vedanta Group

 

36 Month

Completed
3. Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at HMEL, Bathinda (Punjab). STEAG/HMEL 24 Month Completed

 

Read More

JSW

Sr.  No Description of Works Plant / Client Name Duration Status
1 Operation & Maintenance of Ash Handling Plant CPP Unit 3 & 4 (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.

 

JSW 36 Months Continue…
2. Annual Maintenance, Preventive Maintenance & Breakdown Maintenance of Boiler, Turbine and its Auxiliaries CPP- I,II,III,IV & SBU- I,II at 1690 MW JSW Energy Limited, Bellary Karnataka.

 

 

JSW

 

36 Month

Continue…
3. AMC for Mechanical Preventive Maintenance & Misc. Services of Boiler and Auxiliaries of SBU 2 and CPP3&4 units Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. JSW 24+12 Month Completed
4. AMC for Mechanical Breakdown Maintenance & Misc. Services of Boiler, CHP and Auxiliaries of SUB2 and CPP3&4 Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.

 

JSW 24+12 Month Completed
 

5.

Annual Overhauling of ESP, APH of SBU #2, CPP3 at 4X300 MW JSW Energy, Bellary

 

 JSW  02 Month Completed
6. Annual Overhauling of Boiler and Turbine with auxiliaries at 4X300 MW JSW Energy, Bellary JSW 02 Month Completed
7. Annual Overhauling of LT Motors at 4X300 MW JSW Energy, Bellary JSW 02 Month Completed
Read More

SEL IPP/ EESI

Sr.  No Description of Works Plant / Client Name Duration Status
1. Complete Maintenance (Routine, Breakdown, Preventive) of Boilers along with its auxiliaries of 4 x 600MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda SEL IPP/ EESI 52 Months Completed
2. Field Operations of BOP of 4 x 600 MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda SEL IPP/ EESI 42 Month Completed
3. Capital Overhauling of Pressure Parts, Burners, Pent & Dog House, Fans – (ID/FD/PA/SA), Valves, Ducting, Pumps, Compressors, Gates and Dampers etc. of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Months Completed
4. Maintenance for the housekeeping and material management of 4 x 600 MW boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda SEL IPP/ EESI 36 Month Completed
5. Capital Overhauling of ESP & Bag Filters of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Month Completed
6. Capital Overhauling of Coal Mills, Gates & Dampers of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Month Completed
7. Capital Overhauling of Air Pre Heaters of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Month Completed
8. Design, Detailing, Supply of Material, Fabrication, Erection and Assembly of Access & Platforms at 4×600 MW IPP of Sterlite Energy limited at Jharsuguda, Orissa. SEL IPP/ EESI 12 Months Completed
Read More

DB POWER

Sr.  No Description of Works Plant / Client Name Duration Status
1 Commissioning Support for Complete Power Plant for Mechanical, Electrical and C&I for BTG, BOP Equipment, Associated Piping, CHP & AHP of 2×600 MW DBPL BADAHARA, Chhattisgarh DB POWER 24 Month Completed  
Read More

Adani Power Rajasthan Ltd.

Sr.  No Description of Works Plant / Client Name Duration Status
1 Providing Complete mechanical maintenance Service including preventive maintenance, regular maintenance & break down maintenance of Boiler & its Auxiliaries (including ESP), Turbine Auxiliaries and BOP and Boiler tubes weld joints repair for Unit-I & II, Kawai Thermal Power Plant, Rajasthan

 

Adani Power Rajasthan Ltd. 24 Month Continue…
Read More

NTPC Limited

Sr.  No Description of Works Plant / Client Name Duration Status
1 Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Boiler, Turbine, Air Compressors and AC of Stage-I (3 X 800 MW) Units at NTPC Kudgi, Karnataka

 

NTPC Limited, Kudgi 36 Month Continue…
 

2.

Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Balance of Plant (BOP) of Stage-I (2 X 800 MW) Units at NTPC Gadarwara

 

 

NTPC Limited
Gadarwara

 

36 Month

Continue…
Read More

Essar Power M.P Limited

 

Sr.  No Description of Works Plant / Client Name Duration Status
1 Annual Mechanical Maintenance of BTG, BOP and AHP for Unit # 1 & Unit # 2 Essar Power M.P Limited 36 Month Continue…
2. Annual overhauling of Boiler Pressure Part, APH, FAN, Coal Burner, Safety valve 2X600 MW Essar Power M.P Limited, Bandhora, Waidhan, M.P

 

Essar Power M.P Limited 1 Month Completed

 

Read More

ISGEC

Sr.  No Description of Works Plant / Client Name Duration Status
1. Fabrication of Pressure Vessels and Evaporators. Y’NAGAR/ ISGEC 1..5 Years Completed
 
2.
Fabrication, Assembly, Welding, Pre/Post Weld Treatment and Hydro Testing of Headers. Y’NAGAR/ ISGEC  

36 Month

Completed 
 
3.
Fabrication of Pressure Parts of High-Pressure Boiler Components i.e. Water Wall Tubes, Economiser, LTSH, Loose Tubes, Panels, Roof Tubes. RATANGARH/ ISGEC 2.5 Years Completed
Read More

ICS Senegal

Sr.  No Description of Works Plant / Client Name Duration Status
1 Turn around Maintenance of SAP & PAP at 01 MT capacity at ICS-Senegal (International). Includes Piping, Equipment’s(rotary +Static) ICS Senegal 06 Month Completed 
Read More