UPCL

Sr.  No Description of Works Plant / Client Name Duration Status
1 AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd. UPCL 24 Months Completed   
Read More

JSPL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Annual Mechanical Maintenance & Operations of Boiler Turbine Generator & BOP of 4×135 MW power plants at DCPP of JSPL at Dongamuha, Raigarh. JSPL 12 Months Continue…
2. Misc. work During Overhauling including Vortex Plate & APH tube replacement in 4 x135 MW JSPL, Korba, CG. JSPL 01 Month Completed
3. Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL, Raighar. JSPL 02 Month Completed
4. Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc.  For 135 MW Power Plant at Angul, Orissa. JSPL 1.5 Month Completed
 5. Annual Overhauling of Boiler   Pressure Parts, IBR HP Valve, BED Nozzles etc.  For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. JSPL 01 Month Completed
6. Annual Overhauling and Annual Maintenance of Boiler, Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc.  For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh. JSPL 01 Month Completed
7. Resolving Operation problems including proposing modifications of 4 x 135 MW, CFBC Boilers at DCPP, JSPL, Raigarh JSPL 01 Month Completed

 

Read More

GVK

Sr.  No Description of Works Plant / Client Name Duration Status
1 Complete Operation & Maintenance Services for BTG, BOP, SwitchYard, Electrical and C&I and Auxiliaries including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at Goindwal Sahib, Punjab. GVK 36 Month Continue…
 2. Field operations of Boiler, Coal Mills, Fans, DM Plant, FOPH, CW/ RW / FF / SW / PW/ ETP/ STP, Turbine & its Auxiliaries, ESP, Ash Handling Plant, SwitchYard, Switch Gears including HT / LT System etc.  of 2 x 270 MW Power Plant at Goindwal Sahib, Punjab. GVK 36 Month Completed

 

 

Read More

TRN Energy Limited

Sr.  No Description of Works Plant / Client Name Duration Status
1 Maintenance Contract of BTG & Mill Reject System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po- Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

 

TRN Energy  Limited 36 Months Continue…
2. Maintenance Work For Electrical and C & I at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

 

TRN Energy  Limited 36 Month Continue…
3. Annual Service Contract for Maintenance of Main Plant and Plant Water System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

 

TRN Energy  Limited 12 Month Completed
4. Operation & Maintenance of Ash Handling Plant at 2 X 300 MW TRN Energy Pvt.Ltd, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

 

TRN Energy  Limited 12 Month Completed
Read More

STEAG/TSPL

Sr.  No Description of Works Plant / Client Name Duration Status
1 Annual Mechanical Maintenance Contract for Boiler & its Auxiliaries, TG & its Auxiliaries, Balance of Plant, Operation Assistance in Water Treatment Plant including material handling and Housekeeping of 3x660MW Super Critical Power Plant of M/S Talwandi Sabo Power Limited,Vill. Banwala, Dist. Mansa, Punjab for Five Years.

 

STEAG/TSPL 60 Months Continue…
 

2.

Operation and maintenance of Boiler, Ash Handling & its Auxiliaries of 3×660 MW Super Critical Thermal Power Plant at Talwandi Sabo, Mansa Punjab.

 

 

TSPL/Vedanta Group

 

36 Month

Completed
3. Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at HMEL, Bathinda (Punjab). STEAG/HMEL 24 Month Completed

 

Read More

JSW

Sr.  No Description of Works Plant / Client Name Duration Status
1 Operation & Maintenance of Ash Handling Plant CPP Unit 3 & 4 (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.

 

JSW 36 Months Continue…
2. Annual Maintenance, Preventive Maintenance & Breakdown Maintenance of Boiler, Turbine and its Auxiliaries CPP- I,II,III,IV & SBU- I,II at 1690 MW JSW Energy Limited, Bellary Karnataka.

 

 

JSW

 

36 Month

Continue…
3. AMC for Mechanical Preventive Maintenance & Misc. Services of Boiler and Auxiliaries of SBU 2 and CPP3&4 units Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. JSW 24+12 Month Completed
4. AMC for Mechanical Breakdown Maintenance & Misc. Services of Boiler, CHP and Auxiliaries of SUB2 and CPP3&4 Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.

 

JSW 24+12 Month Completed
 

5.

Annual Overhauling of ESP, APH of SBU #2, CPP3 at 4X300 MW JSW Energy, Bellary

 

 JSW  02 Month Completed
6. Annual Overhauling of Boiler and Turbine with auxiliaries at 4X300 MW JSW Energy, Bellary JSW 02 Month Completed
7. Annual Overhauling of LT Motors at 4X300 MW JSW Energy, Bellary JSW 02 Month Completed
Read More

Reliance Rosa

Sr.  No Description of Works Plant / Client Name Duration Status
 

1.

Annual Maintenance Contract of Boiler, Mill & its Auxiliaries of 4×300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh. Reliance Rosa 36 Month Continue…
 

2.

Annual Overhauling of Boiler Pressure Part, APH, Fans, ESP & Coal burner of Unit 1 & 3 of 4×300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh.

 

Reliance Rosa 01 Month Completed

Read More

SEL IPP/ EESI

Sr.  No Description of Works Plant / Client Name Duration Status
1. Complete Maintenance (Routine, Breakdown, Preventive) of Boilers along with its auxiliaries of 4 x 600MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda SEL IPP/ EESI 52 Months Completed
2. Field Operations of BOP of 4 x 600 MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda SEL IPP/ EESI 42 Month Completed
3. Capital Overhauling of Pressure Parts, Burners, Pent & Dog House, Fans – (ID/FD/PA/SA), Valves, Ducting, Pumps, Compressors, Gates and Dampers etc. of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Months Completed
4. Maintenance for the housekeeping and material management of 4 x 600 MW boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda SEL IPP/ EESI 36 Month Completed
5. Capital Overhauling of ESP & Bag Filters of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Month Completed
6. Capital Overhauling of Coal Mills, Gates & Dampers of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Month Completed
7. Capital Overhauling of Air Pre Heaters of 2 x 600 MW Power Plants at Jharsuguda. SEL IPP/ EESI 01 Month Completed
8. Design, Detailing, Supply of Material, Fabrication, Erection and Assembly of Access & Platforms at 4×600 MW IPP of Sterlite Energy limited at Jharsuguda, Orissa. SEL IPP/ EESI 12 Months Completed
Read More

DB POWER

Sr.  No Description of Works Plant / Client Name Duration Status
1 Commissioning Support for Complete Power Plant for Mechanical, Electrical and C&I for BTG, BOP Equipment, Associated Piping, CHP & AHP of 2×600 MW DBPL BADAHARA, Chhattisgarh DB POWER 24 Month Completed  
Read More

LANCO Power Corporation

Sr.  No Description of Works Plant / Client Name Duration Status
1 Routine, Preventive, Predictive Maintenance of Boiler, Turbine and Auxiliaries, All Pumps, DM water plant, Fans of Cooling Towers, Fans, Compressors, HFO system, Ash Handling & BOP etc. of 2×600 MW at LANCO Anpara Power Corporation Ltd, Uttar Pradesh.

 

LANCO Anpara Power Corporation Ltd 36+36 Month Continue…
 

2.

AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd.

 

LANCO-Amarkantak 36 Month Completed

Read More